Laserfiche WebLink
ifTh SOUTHERN <br /> WU N D E R G R D U N D <br /> INDUSTRIES <br /> PROPOSED CONSTRUCTION SEQUENCE <br /> In order to perform this work with minimal impact to the park patrons, it is proposed that a <br /> fenced staging area in the grassed park area(6 ft high fence with canvas) be utilized to the <br /> remove and disassemble the existing frame and canvas and assemble the new frame <br /> (approximately 2-3 days). The park will only need to be completely closed for a short time <br /> 2 separate times on a Monday or Tuesday morning (lowest usage according to park staff) so <br /> that a crane can be mobilized in order to move the frames from the playground to the <br /> staging area, where they can safely be worked on without interrupting the park patrons. <br /> After completion_ the fence will be removed and any grassed areas disturb will be regarded <br /> and re-sodded. We believe this is the most efficient and safe manner to perform this work, <br /> but we are open to considering a different approach if the City desires. <br /> Based on this scope of work and as per the detailed breakdown attached, Southern <br /> Underground Industries proposes to complete this work for a lump sum price of S74,973.63 <br /> and we will need 1-2 weeks to complete all work after obtaining a City building permit. It <br /> may be in the City's best interest to add a contingency to this proposal for any unforeseen <br /> or additional work that may arise. Feel free to call me with any questions regarding this <br /> proposal further. Thank you for the opportunity. <br /> Sincerely, <br /> Juan B rreneche. P.E.. Vice President <br /> Southern Underground Industries, Inc. <br /> 3453 NW 44 Street, Suite 205, Oakland Park, FL 33309 (954)650-4699 Page 2 of 2 <br />