My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shoreline Foundation
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-09-01 Construction of the N. Bay Road Pedestrian Emergency Bridge
>
Responses
>
Shoreline Foundation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 10:56:35 AM
Creation date
4/21/2015 10:44:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction of the N. Bay Road Pedestrian Emergency Bridge
Bid No. (xx-xx-xx)
14-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SF� <br />2781 S.W. 56`h Avenue . Pembroke Park, Florida 33023 <br />Phone: (954) 985 -0460 . Fax: (954) 985 -0462 . www.shorelinefoundation.com <br />April 20, 2015 <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />Re: Bid Comparison Considerations —The Shoreline Foundation Difference <br />Subject: Letter of Introduction. <br />Shoreline Foundation, Inc. would like to take this opportunity to thank you for allowing us to provide <br />you with our proposal for Construction of the North Bay Road Pedestrian Emergency Bridge and <br />to convey our sense of enthusiasm about working with you on this endeavor. During your evaluation of <br />the respective bids you have received, please take into account the following considerations which we <br />provide you as part of our routine operational approach to providing our clients with the best in <br />specialty marine construction and deep foundation services. <br />1. Shoreline Foundation, Inc. has one of the most extensive Insurance Policies in the Marine <br />Construction Industry. Not only do we have a $1M General Liability Policy, we also carry $10M <br />in Excess Liability and Longshoreman's Insurance <br />2. Your project will have a dedicated Project Manager who will visit the site as needed, and who will <br />be accessible to you 24 hours a day throughout the duration of the project. We will dedicate full <br />time onsite Superintendents who will oversee our work and assist in coordinating the work of the <br />other trades. <br />3. All of the SFI Foreman and Supervisors are OSHA 10 -hour certified and CPR Certified. These <br />are our minimum requirements which are continually supplemented by a continuing education <br />process as facilitated by our full-time corporate safety officer in coordination with our <br />independent safety officer consultant. Safety is job one. <br />4. All of SFI's cranes and operators are State Certified and fastidiously maintained by our full-time <br />heavy machinery and mechanical maintenance staff Afechanical failures are addressed <br />immediately and repairs are generally completed in less than 24 hours. All of SFI's barges and tugs <br />are dry docked and inspected on an annual basis and are operated in excellent working condition. <br />5. SFI expert crews have been constructing marine structures throughout Florida and the Caribbean for <br />over 25 years. With an average tenure of over 14 years for our key field personnel there is little left to <br />chance when it comes to challenges on -site. Our Full-time OSHA Safety Training Officer, Professional <br />Engineers and Project Management Team are the best in the industry. <br />Members of: Deep Foundation Institute . Pile Drivers Contractors Association . CASF <br />
The URL can be used to link to this page
Your browser does not support the video tag.