Laserfiche WebLink
rLtl � :,t ®1 <br />SAnreliue FnunJufirrn lue. - <br />April 17, 2015 <br />PAST AND TECHNICAL RELEVANT BUILDING EXPERIENCE <br />Project: Historic Sunny Isles Beach/ New Port Pier <br />Location: <br />Sunny Isles Beach, FL <br />Owners Representative: <br />Gio Batista <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />Miami, FL 33160 <br />(305) 792 -1711 <br />Fax: (305) 792 -1614 <br />gba6stat,sibfl.net <br />Construction Dates: <br />START: 1 /2011 <br />FINISH: Estimated 06/2013 <br />Construction cost: <br />$3,777,866.00 <br />Change Orders: <br />None <br />Project Status: <br />Completed <br />SFI Project Manages <br />Jawaid Karamat <br />SFI Project Superintendant: <br />Fred Maxwell <br />Relevance /Scope of Work: <br />Demolition /Removal of the 600' old <br />Newport fishing pier and restaurant. New <br />pier construction consisted of the <br />installation of 24" x 24" x 120' long ( + / -) <br />concrete pile, poured -in -place concrete pile <br />caps and pre - fabricated/ pre - stressed double <br />T concrete deck slabs. Pier to receive PVC <br />coated aluminum handrail with ADA fishing locations, navigational lights, fire alarm horn /strobes lights and salt <br />water distribution system. Restaurant construction included; CNN block construction with hurricane windows, bait <br />hop, bathrooms and restaurant kitchen. Separate mechanical and electrical rooms, access ramps and beach restoration. <br />nw'Iww4m <br />OM. OW413 <br />Shonllne Found.11on [no. N.V al Rvwv PW R Aasfau'Ml BmM3g uiP >s. - eormiss <br />2781 S.W. 56" Avenue . Pembroke Park, Florida 33023 <br />Phnnn• /QFd1 ORS_ndRn . P.v• fQRA% QAr -nAR9 _ un�nu chnrnlinnfnnnrinfinn nnm <br />