Laserfiche WebLink
SAnrefinr /•innufufinn /ur. =� '��r� <br />Project: Dan Russell Pier <br />Location: <br />Panama City, <br />Owners Representative: <br />Mr. Dave Hemphill <br />BASKERVILL - DONOVAN, INC. <br />449 West Main Street, <br />Pensacola, Florida 32591 <br />(850) 438 -9661 ex. 4360 <br />dkh&bdi- ae.com <br />Gross square feet of construction: <br />65,000+ <br />Construction cost: <br />$7,703,237.00 <br />Project Status: <br />Dan Russell Pier- Completed 1/2010 <br />SFI Project Manager: <br />Carlos Varela <br />SFI Project Superintendant: <br />Fred Dlax- vell <br />Relevance /Scope of Work: <br />As designed by Baskerville- Donovan, <br />Inc., this project required SFI to install <br />10T long 30" diameter octagonal concrete <br />pile as the foundation for one of the <br />longest piers on Florida's Gulf Coast. The <br />new 1,500 foot long piers which extend <br />into the Gulf of Mexico were constructed <br />from the top down to avoid impact to the <br />sensitive marine habitats in the <br />surrounding waters. The installation of <br />removable deck panels fastened to <br />concrete beams allows wave energy to <br />dissipate during periods of severe weather <br />which are common in this location. <br />The Dan Russell Pier was completed <br />ahead of schedule <br />April 17, 2015 <br />2781 S.W. 56th Avenue . Pembroke Park, Florida 33023 <br />Phnnn• /UFAh ORF_nAAn - r=w• /OSAh Q;t R-nAA9 . .en.nu a hn,.Hn.M,,nA.finn nnm <br />