Laserfiche WebLink
Slurn'line /•inmJu /iun hie. �' 7. s ®� <br />Project: Riverwalk — Lagoon Pedestrian Bridge <br />Location: <br />Jupiter, Florida <br />Owners Representative: <br />Tom Lepore, Director <br />•TOWN OF JUPITER <br />Engineering & Public Works Department <br />210 MGtary'I'rail, Jupiter, FL 33458 <br />(561) 741 -2680 <br />Tonal, a,juuiten fl.usfl.us <br />Completion Date: <br />9/29/08 <br />Gross square feet of construction.. <br />10,785 <br />Construction cost: <br />$1,935,175 <br />Project Status: <br />Completed <br />SFI Project Manager: <br />Matt Sturm <br />SFI Project Superintendant: <br />Fred Maxwell <br />Relevance /Scope of Work: <br />As designed by Bridge Design, Inc. this project <br />consisted of constructing a new concrete <br />pedestrian bridge approximately 800' long over <br />the Intracoastal Waterway. SFI's expert craftsmen <br />pre -cast all the concrete elements in -house to <br />insure the town and engineer's quality control <br />requirements could be met. Construction <br />included pre -cast concrete pile, pre -cast concrete <br />pile caps and deck slabs. Complete with custom <br />decorative handrails, custom lighting bollards <br />Lrcorporating the Town of Jupiter Logo and a <br />custom paint Finish, this project was completed <br />on time and under budget. <br />This project was awarded the 2009 Florida <br />Section AP\CIA Project of The Year (Transportation Structures). <br />April 17, 2015 <br />2781 S.W. 56th Avenue . Pembroke Park, Florida 33023 <br />Phnnu• /QFdI QRF_nAnn - Fw• /aFdl oA6_ndR9 .m.m. ehnrnlinnfnnnrintinn nnm <br />