My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ebsary Foundation Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-09-01 Construction of the N. Bay Road Pedestrian Emergency Bridge
>
Responses
>
Ebsary Foundation Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2015 10:17:15 AM
Creation date
4/21/2015 10:59:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction of the N. Bay Road Pedestrian Emergency Bridge
Bid No. (xx-xx-xx)
14-09-01
Project Type (Bid, RFP, RFQ)
RFP
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ebsary Foundation Company <br />Past Performance Documentation <br /> <br /> <br />PROJECT: Design/Build Navy Pedestrian Bridge <br />Key West, Florida <br /> <br />1. Contract number of referred project: <br /> <br />City of Key West RFP# 04-008 <br /> <br />2. Description and location of work: <br /> <br />This project was a design build bridge construction project that was managed by the City of Key West but <br />ultimately was constructed for the US Navy at Ft. Zachary Taylor in Key West. The project was designed <br />to be constructed on cast in place concrete footers and had to allow for future truck traffic to travel under the <br />bridge for the eventual new entrance into Ft. Zachary Taylor State Park. The project consisted of design, <br />permitting, cast in place concrete footers and landing slabs, precast and set piers, a 10ft x 120ft steel truss <br />bridge, prefabricated steel stairs, bridge painting, cast in place bridge deck, solar electrical lighting and brick <br />façade on each pier. <br /> <br />3. Company Role: <br /> <br />General Contractor <br /> <br />4. FDOT Related Work Classes Performed: <br /> <br />Minor and Intermediate Bridge, Grading, Bridge Deck Overlays, Bridge Painting, Electrical Work, Portland <br />Cement Concrete Roadway Paving <br /> <br />5. Relevancy To Work Classes: <br /> <br />Ebsary Foundation Company was contracted to perform heavy highway and bridge construction utilizing all <br />of equipment, manpower, type of construction and management requirements all directly relate to <br />Intermediate Bridge Construction. Most specifically this project incorporated start to finish Intermediate <br />Bridge Construction, with center to center concrete pier spacing of 120ft on center; additionally it included, <br />cast in place concrete bridge deck, cast in place approach slabs and pier construction, bridge truss erection, <br />bridge painting and concrete coating, stair erection, site work, solar electrical lighting installation and brick <br />façade installation. Additionally, this project was performed in a secure US Naval Base and in a historically <br />sensitive location due to its proximity to the Ft. Zachary Taylor State Park and required numerous levels of <br />inspections, quality control and certification which are similar to FDOT projects <br /> <br />6. Owner or General Contractor Contact Information <br /> <br />Doug Bradshaw <br />City of Key West – Port Operations <br />201 Williams Street <br />Key West, FL 33040 <br />Phone: (305) 809-3792 <br />Email: dbradsha@keywestcity.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.