|
Mark Belliveau 1
<br />MARK BELLIVEAU
<br />Superintendent
<br />
<br />Position: Superintendent
<br />Ebsary Foundation Company
<br />2154 N.W. North River Drive
<br />Miami, Florida 33125
<br />Phone (305) 325-0530
<br />MBelliveau@ebsaryfoundationco.com
<br />
<br />Responsibility: Management and supervision of all construction activities; which include, construction
<br />means and methods, direction of field staff, scheduling manpower and resources,
<br />coordinating deliveries, equipment utilization and maintenance, construction layout,
<br />quality assurance, progress reports and daily logs, timesheets, installation logs, safety
<br />reports and toolbox safety meetings. Projects include Deep Foundations, Heavy
<br />Highway and Marine Construction and include driven piling, caissons, augercast piling,
<br />sheet piling and combi-walls, bulkheads and seawalls, cofferdams and shoring, precast
<br />concrete, soundwalls and drilled shafts. Over 25 years combined experience specializing
<br />in deep foundations and marine construction.
<br />
<br />Experience: Ebsary Foundation Company, Miami, Florida – 9 years as a Foundation and Marine
<br />Construction Superintendent. Work included drilled shafts, steel sheet piling and combi-
<br />walls, driven concrete, steel and timber pile, soundwalls, grouted soil anchors, tiebacks,
<br />cofferdams, augercast piling, seawalls, falsework, cast in place concrete, tremie concrete,
<br />diver work, bridge and marine construction.
<br />
<br />Berkel & Company, Atlanta, Georgia – 2 years as a Foundation Superintendent and 4
<br />years as a Piledriver Foreman. Supervised augercast pile installation projects in the
<br />Southeast U.S.
<br />
<br />Lanzo Construction, Miami, Florida – 2 years as a Foreman. Work included installation
<br />of sheet piling cofferdams and large diameter sewer outfall pipe from the City of Miami
<br />Beach wastewater treatment plant to approximately 1 mile in the Atlantic Ocean.
<br />
<br />GLF Construction, Miami, Florida – 2 years as a Bridge Foreman. Worked on the
<br />rehabilitation and construction of the Venetian Causeway Bridge in Miami; work
<br />included, 54” drilled shafts, bridge demolition and cast in place concrete pile caps.
<br />
<br />PowerMix Industries, Deerfield Beach, Florida – 3 years as a Piledriver Foreman. Work
<br />included augercast piling and steel sheet piling.
<br />
<br />Misner Marine, Tampa, Florida – 5 years as a Piledriver Journeyman and Foreman.
<br />Work included driven piling, bridge construction, sheet piling, formwork, cast-in-place
<br />concrete and marine construction.
<br />
<br />Atlantic Foundation, North Miami Beach, Florida – 10 years as a Piledriver Journeyman
<br />and Foreman. Work included driven piling, bridge construction, sheet piling, formwork,
<br />cast-in-place concrete and marine construction.
<br />
<br />
|