Laserfiche WebLink
Mark Belliveau 1 <br />MARK BELLIVEAU <br />Superintendent <br /> <br />Position: Superintendent <br />Ebsary Foundation Company <br />2154 N.W. North River Drive <br />Miami, Florida 33125 <br />Phone (305) 325-0530 <br />MBelliveau@ebsaryfoundationco.com <br /> <br />Responsibility: Management and supervision of all construction activities; which include, construction <br />means and methods, direction of field staff, scheduling manpower and resources, <br />coordinating deliveries, equipment utilization and maintenance, construction layout, <br />quality assurance, progress reports and daily logs, timesheets, installation logs, safety <br />reports and toolbox safety meetings. Projects include Deep Foundations, Heavy <br />Highway and Marine Construction and include driven piling, caissons, augercast piling, <br />sheet piling and combi-walls, bulkheads and seawalls, cofferdams and shoring, precast <br />concrete, soundwalls and drilled shafts. Over 25 years combined experience specializing <br />in deep foundations and marine construction. <br /> <br />Experience: Ebsary Foundation Company, Miami, Florida – 9 years as a Foundation and Marine <br />Construction Superintendent. Work included drilled shafts, steel sheet piling and combi- <br />walls, driven concrete, steel and timber pile, soundwalls, grouted soil anchors, tiebacks, <br />cofferdams, augercast piling, seawalls, falsework, cast in place concrete, tremie concrete, <br />diver work, bridge and marine construction. <br /> <br />Berkel & Company, Atlanta, Georgia – 2 years as a Foundation Superintendent and 4 <br />years as a Piledriver Foreman. Supervised augercast pile installation projects in the <br />Southeast U.S. <br /> <br />Lanzo Construction, Miami, Florida – 2 years as a Foreman. Work included installation <br />of sheet piling cofferdams and large diameter sewer outfall pipe from the City of Miami <br />Beach wastewater treatment plant to approximately 1 mile in the Atlantic Ocean. <br /> <br />GLF Construction, Miami, Florida – 2 years as a Bridge Foreman. Worked on the <br />rehabilitation and construction of the Venetian Causeway Bridge in Miami; work <br />included, 54” drilled shafts, bridge demolition and cast in place concrete pile caps. <br /> <br />PowerMix Industries, Deerfield Beach, Florida – 3 years as a Piledriver Foreman. Work <br />included augercast piling and steel sheet piling. <br /> <br />Misner Marine, Tampa, Florida – 5 years as a Piledriver Journeyman and Foreman. <br />Work included driven piling, bridge construction, sheet piling, formwork, cast-in-place <br />concrete and marine construction. <br /> <br />Atlantic Foundation, North Miami Beach, Florida – 10 years as a Piledriver Journeyman <br />and Foreman. Work included driven piling, bridge construction, sheet piling, formwork, <br />cast-in-place concrete and marine construction. <br /> <br />