Laserfiche WebLink
<br />Miami-Dade Branch <br />6600 NW 32 Ave <br />Miami, FL 33147 <br /> <br />Ph: (305) 696-7902 <br />Fax: (305) 696-7903 <br />e-mail: cg@jvaengineering.com <br />Cesar Gonzalez <br />Experience <br /> <br />2009-Present JVA Engineering Contractor, Inc. <br />Project Manager <br />2013 City of Miami- Citywide Sewer Repair Contract, M-0083 Installation and <br />Repair of the Storm Sewer system at locations citywide <br />2013 City of Miami- Miami River Greenway NW 5th Bridge Extension <br />Furnishing all materials, labor, and equipment, necessary for road <br />improvements, drainage system installations, milling and resurfacing, new <br />sidewalks replacement, striping, signs, landscaping, hardscape, decorative <br />street and pedestrian lighting, and ADA compliant ramps <br />2012 City of Opa-Locka- 143rd Street Distribution Piping Project, Roadway <br />Reconstruction <br />2012 City of Hollywood- Distribution Piping Upgrade for Existing Condition N <br />56th Ave from Douglas Street to Stirling Road to N 58th Avenue , Furnish and <br />Install 8-inch D.I. Pipe and all D.I. Fittings <br />2012 Miami-Dade Water & Sewer Improvements-Furnish & Install 36-Inch D.I. <br />Water Main in NW 87th Avenue, Approximately 1,905 LF of 36-Inch and 25 <br />LF of 6-inch ductile iron pipe and fittings for a water main in NW 87th Avenue <br />from NW 154 Street to NW 186 Street, Section 10, 15, and 16 <br />2011 Miami-Dade Water & Sewer Improvements-Perrine/Cutler Ridge Water <br />& Sewer Improvements Basin A P0067- 4,991 LF of Water Main Installation, <br />5,035 LF of Sanitary Sewer Installation and 848 LF of 12” Gravity Sewer <br />Installation, Sewer Lateral Installations and Restoration <br />2011 Miami-Dade Aviation Department- MIA NW 67th Ave and NW 36th Street <br />Intersection Improvements, Land Clearing, Excavation, Earthwork, Pre- <br />Stressed Concrete Pipe Storm Sewer Distribution, Subgrade, Base and <br />Asphalt Pavement <br />2011 City of Miami- Kinloch Storm Sewer and Road Construction Project, <br />Storm Drainage Distribution, Asphalt Pavement, and Concrete Work <br />2010 Marlins Ballpark, Storm Water Distribution <br />2009 Miami-Dade Water & Sewer- 8” Water Main Extension, Excavation Water <br />Main Distribution, Restoration including Asphalt Pavement, and Concrete <br />work <br />2009 Miami-Dade County Water & Sewer Department, NAP Misc. 12” Sanitary <br />Sewer and Force Main Improvements, sanitary sewer and force main <br />replacements, asphalt restoration, concrete restoration. <br />2009 Miami-Dade County Water & Sewer Department, Pump Station No. 57 <br />Upgrade Sewage Pump Station including place suitable backfill material; <br />refurbish wet well; electrical work, concrete sidewalk; and restoration <br />2009 Miami-Dade County Water & Sewer Department, Pump Station No. 46 <br />Upgrade Sewage Pump Station including place suitable backfill material; <br />refurbish wet well; electrical work, concrete sidewalk; and restoration <br />2009 Port of Miami, Cruise Terminal D&E Runway Extension for PBB and <br />Mooring Bollards Construction of reinforced concrete runway and wheel <br />pad slabs; compression auger cast piles; mooring bollards foundation <br />concrete caps; tension auger cast piles; procurement and installation of six <br />mooring bollards and demolition of abandoned electrical bays