Laserfiche WebLink
<br /> <br />Page 7 <br /> <br />1.15. Turnpike HEFT at S.W. 104th to S.W. 184th Sound Walls – Florida Turnpike Authority – <br />Install Augercast Piles and set templates and posts for Sound Walls. Contract Value: <br />$1,790,673. George Southworth, Concrete Impressions of Florida, Inc. (813) 899-4284, <br />gls@ciflorida.com. <br />1.16. I-75 Express Segment C (Miramar to Sheridan) Sound Walls – Florida Department of <br />Transportation – Install Augercast Piles and set templates and posts for Sound Walls. <br />Contract Value: $795,951. George Southworth, Concrete Impressions of Florida, Inc. <br />(813) 899-4284, gls@ciflorida.com. <br />1.17. US-41 (SR951 to Greenway Road) Sound Walls – Florida Department of Transportation – <br />Install Augercast Piles and set templates and posts for Sound Walls. Contract Value: <br />$515,207. George Southworth, Concrete Impressions of Florida, Inc. (813) 899-4284, <br />gls@ciflorida.com. <br />1.18. SR 951/Collier Blvd. Sound Walls – Florida Department of Transportation – Install <br />Augercast Piles and set templates and posts for Sound Walls. Contract Value: $237,456. <br />George Southworth, Concrete Impressions of Florida, Inc. (813) 899-4284, <br />gls@ciflorida.com. <br />1.19. US-27 Barry Road to US-192 Sound Walls – Florida Department of Transportation – <br />Install Augercast Piles and set templates and posts for Sound Walls. Contract Value: <br />$771,744. George Southworth, Concrete Impressions of Florida, Inc. (813) 899-4284, <br />gls@ciflorida.com. <br /> <br />2. COMPLETED 2015 JOBS <br /> <br />2.1. EAA A-1 Flow Equalization Basin – South Florida Water Management District – Design, <br />furnish, install, and remove temporary sheet pile cofferdams for 16 water control <br />structures. Install approximately 3,870 linear feet of permanent steel sheet piling, 175 <br />thread bar tiebacks, 500 LF of double channel waler, and 160 each 14” prestressed <br />concrete piles. Contract Value: $ 3,279,640.00. Miguel Vila, Central Florida Equipment, <br />Inc., (305) 888-3344, Miguelv@centralfloridaequip.com. <br />2.2. FPL Pipe Bridge Replacement and South Bank Stabilization Project – Florida Power and <br />Light – Construction of new elevated pipe Bridge and demolition of existing pipe bridge <br />and construction of new sheet piling bulkhead. Contract Value: $1,989,000. Bill Figler, <br />Florida Power and Light, (561) 694-4749, William.figler@fpl.com <br />2.3. Area 2 (Bay 177-183) Construction of Seawall – Miami-Dade County Seaport Department <br />– Construction of new 600ft Long anchored bulkhead with backfill, dredging and rip-rap <br />relocation. Contract Value: $ 9,676,000.00. Kari Garland, Miami Dade County Seaport <br />Department, kari@miamidade.gov, (305) 347-4974 <br />2.4. S-133 and S-135 Pump Stations Trash Rake Upgrades and Site Improvements – South <br />Florida Water Management District – Furnish and Install two (2) replacement steel <br />combination wall and precast concrete bridge structures for Trash Rake Upgrades. <br />Includes steel sheet pile underwater cutoff wall and trash rake divider wall and timber and