Laserfiche WebLink
<br /> <br />Page 16 <br /> <br />(Port Everglades) – 66” x 77ft Drilled shafts, augercast piles and concrete pile caps. <br />Contract Value: $2,125,398.00. Gary Bogumill, Port Everglades (954) 468-0149 <br />8.4. Miami Circle Seawall Replacement – Florida Department of Management Services – 550 <br />Wall Foot AZ 39-700 Seawall Replacement, Concrete Cap and Rip-Rap. Contract Value: <br />$1,357,600. Jere Lahey (904) 359-6093 <br />8.5. West Palm Beach Waterfront Commons Foundation – City of West Palm Beach – 14”x <br />40’ Augercast Piling. Zach Young, Catalfumo Construction (561) 694-3000 <br />8.6. Milander Parking Garage Foundation – City of Hialeah – 14”x 48’ Augercast Piling. <br />Contract Value: $162,000. Carlos F. Lopez, Purchasing Supervisor, City of Hialeah (305) <br />883-5846 <br />8.7. Calder Casino Aerial Crossing – Miami-Dade County – 12”x40’ precast concrete piling <br />w/ cast-in-place concrete caps. Contract Value: $26,000. Maria Valentin, Central Florida <br />Equipment, (305) 888-3344 <br />8.8. Port of Miami Cruise Terminal C & D Runway Extension and Bollards – Miami-Dade <br />County Seaport Department – 24” x 69’ augercast piling, 14”x 49’ Augercast Piling, <br />seawall demolition, cast in place concrete caps and new Bollards. Contract Value: <br />$459,220. Cesar Gonzalez, Project Manager, JVA Engineering (305) 696-7902 <br />8.9. City of Cocoa WTM Cofferdams – City of Cocoa Utility and Engineering Division – <br />Sheet pile cofferdams, soil Anchors, tremie seal and 14”x 60ft prestressed concrete piles. <br />Contract Value: $1,550,000. Alex Carstens, Globetec Construction Company (954) 590- <br />3305 <br /> <br />9. COMPLETED 2008 JOBS <br /> <br />9.1. Indian Key Dock Repair – Florida Department of Environmental Protection (FDEP) – <br />Precast concrete and fiberglass dock replacement. Contract Value: $359,000 Randy <br />Strange, Florida Department of Environmental Protection (850) 488-5372 <br />9.2. Bellini Williams Island – Augercast pile foundation. Contract Value: $1,255,000 Kevin <br />Schwarte, 180 Production Management Inc. (786) 338-5360 <br />9.3. Marriott Miami Airport – Augercast pile foundation. Contract Value: $535,000 Ben <br />Vidiella, Suffolk Construction Company (305) 609-4459 <br />9.4. Hollywood Seawall – Prestressed concrete piles, concrete panel seawall, timber dock. <br />Contract Value: $445,000. Jerry McDonald, G.T. McDonald Enterprises (954) 584-3060 <br />9.5. Waverly Condominium Seawall and Provision of Fence Foundation – Sheet pile seawall, <br />concrete cap and landside foundation work. Contract Value: $412,902 Tania Garcia, <br />Waverly South Beach (305) 674-5880 <br />9.6. Matheson Seawall – Steel sheet pile seawall, concrete cap and timber piles. Contract <br />Value: $257,000 Finlay Matheson, Owner (305) 443-4256 <br />9.7. Miami Intermodal Center Fuel Tanks – Florida Department of Transportation – Sheet pile <br />cofferdams, soil anchors and tremie seal. Contract Value: $338,000. Clyde Williamson, <br />Talon Industries (817) 265-5511