My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ebsary Foundation Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-09-01 Construction of the N. Bay Road Pedestrian Emergency Bridge
>
Responses
>
Ebsary Foundation Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2015 10:17:15 AM
Creation date
4/21/2015 10:59:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction of the N. Bay Road Pedestrian Emergency Bridge
Bid No. (xx-xx-xx)
14-09-01
Project Type (Bid, RFP, RFQ)
RFP
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ebsary Foundation Company <br />Past Performance Documentation <br /> <br /> <br />PROJECT: Arch Creek Bike Path & Pedestrian Bridge Replacement Project <br />City of North Miami, Florida <br /> <br />1. Contract number of referred project: <br /> <br />City of North Miami IFB No. 15-12-13 <br />FDOT FIN: 251201-2-58-90; FDOT LAP Contract No. AQV56 <br /> <br />2. Description and location of work: <br /> <br />The Arch Creek Pedestrian Bridges project is a Florida Department of Transportation (FDOT) LAP project. <br />The bridges have been designed per FDOT criteria to include the American Association of Highway <br />Transportation Officials (AASHTO) Guide Specifications for the Design of Pedestrian Bridges. This <br />project involved the replacement of two existing pedestrian bridge structures with two single-span steel truss <br />pedestrian bridges along the Arch Creek bicycle/shared-use path connecting NE 135th Street to FIU <br />Biscayne Bay Campus in the City of North Miami, Florida. The two bridges are comprised of cast-in-place <br />reinforced concrete abutments supported by 24” square prestressed concrete piles, 12ft x 62ft prefabricated <br />steel truss bridges with cast in place concrete bridge deck, asphalt approach repairs and bridge painting. <br /> <br />3. Company Role: <br /> <br />General Contractor <br /> <br />4. FDOT Related Work Classes Performed: <br /> <br />Minor and Intermediate Bridge, Bridge Deck Overlays, Bridge Painting, Grading, Portland Cement <br />Concrete Roadway Paving <br /> <br />5. Relevancy To Work Classes: <br /> <br />Ebsary Foundation Company was contracted to perform heavy highway and bridge construction utilizing all <br />of equipment, manpower, type of construction and management requirements all directly relate to <br />Intermediate Bridge Construction. Most specifically this project incorporated start to finish Intermediate <br />Bridge Construction, with center to center concrete pier spacing of 60ft on center; additionally it included, <br />cast in place concrete bridge deck, cast in place approach slabs and pile cap construction, bridge truss <br />erection, bridge painting and concrete coating, site work and canal grading. Additionally, this project was <br />performed in an environmentally sensitive location within Arch Creek and required turbidity control and <br />numerous levels of inspections, quality control and certification in conformance with FDOT Standard <br />Specifications for Roadway and Bridge Construction. <br /> <br />6. Specialty Work Classes Performed: <br /> <br /> Pile Driving, Marine Construction <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.