My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution Zoning 15-Z-151
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2015
>
Resolution Zoning 15-Z-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 12:18:23 PM
Creation date
4/23/2015 10:16:17 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
15-Z-151
Date (mm/dd/yyyy)
04/16/2015
Description
Zoning Hrg: St. Tropez on Bay:Phase II&III 290-330 SIBlvd&16690 Collins(Hrg#Z2015-05)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEVELS 20 - 21 LL V LLJ Lu - L 1 <br />N <br />LEVEL 20 - 21 PLANS <br />SCALE 1/1 S' = 1 ' -0" <br />0 10 30 <br />SITE PLAN MODIFICATION <br />REFER TO CLOUDED AREAS FOR CHANGES TO PREVIOUSLY APPROVED SUBMITTAL UNDER RESOLUTION NO. 13 -Z -137 DATED 10.17.13 <br />axioma 3 inc. <br />7418 S.W. 48th St. <br />Miami, Florida 33155 <br />USA <br />3005.5.667.6333 <br />1 3667.6670 <br />edc @axioma3.com <br />6- w .axioma3.com <br />CLIENT / OWNER: <br />J. MILTON AND ASSOCIATES <br />3211 PONCE DE LEON BLVD. <br />CORAL GABLES, FL 33143 <br />Off. 305.460.6300 <br />PROJECT NAME: <br />PHASE II - CONDOMINIUM TOWER IV & V <br />PHASE III - OFFICE BUILDING <br />SUNNY ISLES BEACH, FLORIDA <br />CONSULTANTS:` <br />1 � C <br />0 <br />J, P <br />landscape archileclure <br />14121 :w. 11s a. ml nP,�ae 33106 <br />( 1 37d. z7B2 Aui (3os1 274.2887 IicIX 00001107 <br />REVISIONS <br />Q01 <br />OFFICE TOWER PARCEL <br />BLDG. HGT. DESIGN REVISION <br />RE- SUBMITTAL 08.01.13 <br />01 CONDO TOWER PARCEL <br />STAFF REV. COMMENTS <br />OF 08.01.13 <br />p2 CONDO TOWER PARCEL <br />DESIGN REV. COMMENTS <br />OF 04.06.15 <br />DATE: 08.01.13 <br />CRAVANOS AND SPECIFICATIONS AS INSTRUMENTS OF <br />PROFESSIONAL SERVICE, ARE AND SHALL REMAIN THE <br />PROPERTY OF THE ARCHITECT. <br />THE SECOCUMENTSARENOTTOBEUSED INV OLEORIN <br />PART, FORPNY OTHER PROJECTS OR PURPOSES OR BY <br />ANY OTHER PARTIES. N PROPERLY <br />AUTHOPI BY CONTRACT, VJ,THOUT THE SPECIFIC <br />—TTEN AUTHORISATION OFARIOMA --3. INC. ARCHITECTS. <br />Corporate No: AA0002273 <br />Eduardo Castineim, AIA AR14049 <br />DISCIPLINE/ SHEET TITLE: <br />TOWERS IV & V <br />20 - 21 LEVEL PLANS <br />SCALE: AS SHOWN <br />
The URL can be used to link to this page
Your browser does not support the video tag.