My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2394
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2015 3:27:29 PM
Creation date
4/27/2015 3:27:25 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2394
Date (mm/dd/yyyy)
04/16/2015
Description
2nd Amd to Agmt w/Bell David to Provide Additional Planning and Zoning Srvs
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> "r.v <br /> „- <br /> BELL DAVID PLANNING GROUP, INC <br /> Navigating Florida's Planning Requirements DR AF u <br /> Ms. Claudia Hasbun, City Planner <br /> City of Sunny Isles Beach <br /> 18070 Collins Avenue, 3rd floor <br /> Sunny Isles Beach, FL 33160 <br /> March 20, 2015 <br /> Proposal for City of Sunny Isles Beach Transportation Master Plan and Collins Avenue <br /> Corridor Traffic Analysis Study Methodology <br /> Scope of Services/Price Proposal <br /> Bell David Planning Group is pleased to submit this proposal Transportation Planning and Traffic <br /> Analysis Services. BDPG will utilize The Corradino Group as its Sub-consultant for this project. <br /> 1. OBJECTIVE—Transportation Master Plan <br /> The objective is to study the existing and future conditions of the transportation system within the <br /> City of Sunny Isles Beach, including the roadway network, the transit system, the pedestrian and <br /> bicycle network and parking system to determine how each functions, interacts with the existing <br /> and future land uses, and can be improved to enhanced desired mobility in the community. <br /> This will be done by examining the existing transportation conditions in the City, by looking at <br /> roadway,transit and non-motorized levels of service today, and in two planning horizons. It would <br /> engage the public in the generation of transportation solutions. As a result a project bank of multi- <br /> modal solutions will be developed. Likely costs for these will be developed and the projects will <br /> be prioritized and placed in an implementation plan. <br /> TASKS <br /> Task 1: Public involvement <br /> Engaging the public and incorporating public input is a multi-level process that takes place <br /> consistently throughout the duration of the plans development. This task will focus the project, <br /> pointing it in a direction which is most useful to citizens, staff and elected officials. It is through <br /> this task that an understanding of what is wanted and what the perceived weaknesses in the <br /> system are. Many of these desires and weaknesses will be tested in the data collection and <br /> analysis task. <br /> 1 <br /> Bell David Planning Group <br /> 1019 NE 104th Street Miami Shores, FL 33138 <br /> SIB TMP and CTA 031815 <br /> ATTACHMENT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.