Laserfiche WebLink
Completion. This warranty shall be in addition to whatever rights the City may have under <br /> applicable law. The Contractor's obligation under this warranty shall be at its own cost and <br /> expense, to promptly repair or replace (including cost of removal and installation), that item <br /> (or part or component thereof) which proves defective or fails to comply with the Agreement <br /> within the warranty period such that it complies with the Agreement. <br /> ARTICLE 11. CLEANING UP—THE CITY'S RIGHT TO CLEAN UP <br /> Contractor shall at all times keep the premises free from accumulation of waste materials or <br /> rubbish caused by its operations. At the completion of the Work, Contractor shall remove all <br /> its waste materials and rubbish from and about the Work areas as well as its tools, construction <br /> equipment, machinery and surplus materials. If Contractor fails to clean up during the <br /> prosecution of the Work or at the completion of the Work,the City may do so and the cost thereof <br /> shall be charged to Contractor. Cleaning operations should be controlled to limit dust and other <br /> particles adhering to existing surfaces. <br /> ARTICLE 12. REMOVAL OF EQUIPMENT <br /> In case of termination of this Agreement before completion for any cause whatsoever, <br /> Contractor, if notified to do so by the City, shall promptly remove any part or all of Contractor's <br /> equipment and supplies from the property of the City. If the Contractor fails to comply with the <br /> City's order, the City shall have the right to remove such equipment and supplies at the expense <br /> of Contractor. <br /> ARTICLE 13. CONTRACT DOCUMENTS <br /> The Contract Documents shall consist of this Agreement, Request for Proposal No. 14-11-01, any <br /> Addenda to the Request for Proposal including any Supplemental Terms and Conditions, the <br /> Contractor's response to the Request for Proposal (a copy of which is attached hereto as Exhibit <br /> "A"), the Bid Bond, the Payment and Performance Bond, approved written interpretations and <br /> clarifications, Field Directives, Construction Change Directives, any Change Orders issued <br /> thereto, and any modifications, duly issued after execution of the Agreement. Any modification <br /> to this Agreement shall only be effective if it is reduced to writing, and duly executed by both <br /> parties, except a Field Directive or Constructive Change Directive shall be effective after <br /> approval and execution by the City. The general intent of the Contract Documents is to include <br /> all items necessary for the proper execution and completion of the Project by the Contractor. <br /> ARTICLE 14. SITE INVESTIGATION AND REPRESENTATION <br /> 14.1 The Contractor acknowledges that it has satisfied itself as to the nature and location of <br /> the Work, the general and local conditions, particularly those bearing upon availability of <br /> transportation, disposal, handling and storage of materials, availability of labor, water, electric <br /> power, and roads, the conformation and conditions at the ground and all other matters which can <br /> in any way affect the Work or the Contract Amount. <br /> 14.2 The Contractor further acknowledges that it has satisfied itself as to the character, <br /> quality, and quantity of surface and subsurface materials to be encountered from evaluating <br /> information included in the Contract Documents. Any failure by the Contractor to acquaint itself <br /> 10 <br />