My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2401
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2015 10:06:03 AM
Creation date
5/21/2015 10:05:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2401
Date (mm/dd/yyyy)
04/16/2015
Description
Award Bid 14-11-01 & Agmt w/Florida Engineering & Development for 174th St Roadway Improve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> •__ • CITY OF SUNNY ISLES BEACH <br /> 18070 Collins Avenue <br /> Sunny Isles Beath, Florida 33160 u""r rrrF <br /> 305.947.0606 ••fio• <br /> www.sibfl.net :Y r '' • \n <br /> • :' <br /> Crrr of SUN r� <br /> l%.,4?r• <br /> • <br /> BID PROPOSAL FORM <br /> (Revised 12/04/14) <br /> CITY OF SUNNY ISLES BEACH <br /> NE 174TH STREET ROADWAY IMPROVEMENTS <br /> CSIB RFP NO. 14-11-01 <br /> CAS PROJECT NO. 14-1758 <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE <br /> A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM <br /> AND/OR UNIT PRICES. <br /> ITEM UNIT <br /> NO DESCRIPTION QUANTITY UNIT COST TOTAL • <br /> The lump sum (LS) prices for items 1 through 10 shall be done in accordance with the contract documents and <br /> specifications and all applicable federal, state, and local requirements. Costs for pre-construction video survey are to <br /> be incorporated into item 1. <br /> 1 Mobilization and Demobilization (5%) 1 LS /18 coo 01 143 000.6° <br /> 2 Maintenance of Traffic Including 1 LS /01 Eco /o0 5• <br /> Construction Sequencing <br /> SUBTOTAL ITEMS 1-2 $ [`A-� 00 <br /> • <br /> The lump sum(LS)price for(phased)clearing & stripping shall include but not be limited to temporary storage,removal <br /> and proper disposal of existing ground coverings, bus shelters, asphalt pavement, sidewalks, curb & gutter, concrete <br /> pavement, limerock and subgrade (where applicable), and/or all other organic material from right of way to right of way <br /> as necessary to perform the work stipulated in these contract documents. The lump sum price shall also include but not <br /> be limited to removal,protection, storage of existing signs, decorative stone, landscaping,and sprinkler systems existing <br /> within the work zone. All items shall be restored to as existing (such as existing pavers)or better condition and as per <br /> plans. <br /> I Request for Proposal No.14-11-01 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.