My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Samson Oceanfront Park - Final
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Samson Oceanfront Park - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2015 2:13:06 PM
Creation date
5/27/2015 2:11:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson Oceanfront Park Improvements
Bid No. (xx-xx-xx)
15-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. 15-05-01 24 <br /> <br />15. 700-3102 Furnish & Install - Sign Panel, 12 SF - <br />20 SF <br />AS 1 $ $ <br />16. N/A Turnout Construction - Asphalt <br />(Includes excavation, construction of <br />new base course) <br />SY 17 $ $ <br />17. N/A Laboratory Testing LS 1 $ $ <br /> Subtotal for Site Civil $ <br />THE PRICE FOR EACH CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT <br />AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br />CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, <br />EXCAVATION, DE-WATERING WHERE POSSIBLE, DE-WATERING & NPDES PERMITS, INCLUDING THE REQUIRED <br />CONSTRUCTION OF BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES <br />STANDARDS DURING THE DURATION OF THE PROJECT, BEDDING MATERIAL, BACKFILL BASE MATERIAL, <br />SODDING, CURBING, SIDEWALK, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE <br />RESTORED TO SAME ELEVATION AS EXISTING ASPHALT PAVEMENT (GRADE TO SLOPE) GRADING, TESTING AND <br />ANY OTHER MISCELLANEOUS WORK. <br />SANITARY SEWER <br />18. N/A FLYGT Grinder Pump (Includes all <br />accessories) <br />LS 1 $ $ <br />19. N/A Grinder Pump Electrical Panel & <br />Controller <br />LS 1 $ $ <br />20. N/A Retrofit existing pipe (at restroom <br />connection) <br />LS 1 $ $ <br />21. N/A Furnish & Install - 2" PVC Sanitary <br />Sewer Force Main <br />LF 23 $ $ <br />22. N/A Furnish & Install - Air Release Valve EA _______ $ $
The URL can be used to link to this page
Your browser does not support the video tag.