My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Samson Oceanfront Park - Final
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Samson Oceanfront Park - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2015 2:13:06 PM
Creation date
5/27/2015 2:11:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson Oceanfront Park Improvements
Bid No. (xx-xx-xx)
15-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. 15-05-01 41 <br /> <br />193. N/A Paige Thin Wire; Model No. #14 AWG <br />(Furnish and Install) <br />LF ______ $ $ <br />194. N/A SCH 40 Galvanized Steel (Furnish and <br />Install) <br />LF ______ $ $ <br />195. N/A SCH 40 PVC (Furnish and Install) LF ______ $ $ <br />196. N/A Grounding Location (Furnish and <br />Install) <br />EA ______ $ $ <br /> Subtotal of Irrigation $ <br />PROJECT CLOSE OUT <br />197. N/A Survey Stakeout and As-built record <br />drawings (electronic AutoCAD &PDF <br />format and hard copy) <br />LS 1 $ $ <br />198. N/A Desilting of existing drainage LS 1 $ <br /> Subtotal of Project Close Out $ <br /> BID SUBTOTAL (1 – 198) $ <br />CONTINGENCIES <br />199. N/A Project Contingency (To be used at the <br />sole discretion and direction of the <br />Owner) <br />LS 1 10% $ <br />200. N/A Permit Allowance LS 1 $15,000 <br /> BID TOTAL (1 – 200): $ <br /> ADD ALTERNATES <br />201. N/A Aluminum Picket Fence (Along Top of <br />Entrance Wall) <br />LF 215 $ $ <br />202. N/A 11' - 2" Wide Swing Aluminum Picket <br />Gate <br />EA 2 $ $ <br /> <br />NOTE: The Quantities shown in this Bid Form are estimates only. They are generally representative of the work that will be required by the <br />Contractor. The Contractor shall be responsible for verifying all quantities prior to bid. The Contractor shall ensure that ALL work for the proposed
The URL can be used to link to this page
Your browser does not support the video tag.