perkinswill.com 19 <br />5.PHASE 5: CONSTRUCTION <br />The Physical Realization of Your Vision <br />Perkins+Will is keenly aware of the critical nature of construction schedules and the potential impact on learn- <br />ing that results when deadlines are altered. The construction administration phase is given our full attention to <br />ensure that the projects are completed expeditiously and in the manner intended. <br />We provide administration of the construction contract including: <br />• Advising and consulting with the City’s administrative team <br />• Meeting with governing agencies <br />• Forwarding all owner instructions to the contractor <br />• Review of shop drawings, samples, and other contractor submissions <br />• Contract interpretation <br />• Issuing certificates of payment and certificates of substantial completion <br />• Preparing and issuing change orders <br />On-site observation is provided throughout this phase as merited by the progress of the construction. The on- <br />site Architect will prepare Field Observation Reports for distribution to the contractor/construction manager <br />and owner that enumerate our findings relative to the progress of construction and ensuring that the project is <br />constructed in accordance with the design intent and detail of the Construction Documents.