Laserfiche WebLink
46 City of Sunny Isles Beach New Facility Qualifications for Architectural Design Services <br />   <br />1315 NW 98th Court, Unit 15  Doral, Florida 33172  Tel: (305) 418‐9177, Fax: (305) 418‐9178  <br />Page 2 of 3  <br />  <br />Center, Vinciana Building  <br />The Westin Diplomat Resort & Spa – Hollywood Beach, Florida  <br />M‐P Design Retrofit of Hot Water Boiler Plant, Design Retrofit of Chilled Water piping distribution system for the  <br />entire Facility  <br />EXPERIENCE AND RELEVANT WORK WITH OTHER FIRMS  <br /> Spillis Candela & Partners Inc.   Spillis Candela DMJM   <br />Director of Mechanical Engineering  <br />City of Sunny Isles Beach City Hall & Police Complex – Sunny Isles Beach, FL  <br />HVAC Design of a new 57,032 SF government complex inclusive of city hall, commission chambers, police facility,  <br />and a public library.  <br />Federal Reserve Bank, Birmingham Branch – Birmingham, AL  <br />Engineering Services for the site selection, HVAC design and construction of a building approximately 238,000  <br />gross square feet, which included an atrium Smoke Evacuation system.  <br />Ryder Center, Convocation Center/Arena, University of Miami ‐ Coral Gables, FL  <br />HVAC design of a new 167,665 SF 9,200 seat convocation center/arena with 24 VIP luxury suites.  This Facility  <br />included a Smoke Evacuation system design.  <br />Coral Gables Senior High School – Coral Gables, FL  <br />Mechanical Engineer for this 830 student station addition. The project consisted of a 3‐story classroom.  <br />City of Coral Gables and Parking Garage – Coral Gables, FL  <br />HVAC Design of a new 50,000 SF City Hall and Administration Building inclusive of a 375 car parking garage  <br />designed to harmonize with the existing historic City Hall structures.  <br />Southwest Florida International Airport Terminal, Concourse and Parking Garage – Ft. Myers, FL  <br />HVAC design of a new 3‐story 700,000 SF terminal building, three concourses, 28 gates and Central Chiller Plant  <br />(3600 tons, expanding to 7200 tons).  <br />Camana Bay (West Indian Club) – Grand Cayman, Cayman Islands  <br />Master Planning and Design Development of 255‐acres Multi‐use development school, including Standalone  <br />Chiller Plants with full power generation. Construction Documents for Phase 1A with an estimated construction  <br />budget cost of U.S $550 million.  Design included HVAC, Plumbing and Fire Protection.  The large capacity Chiller  <br />Plant for Master Program, Design planning for a new 75,000 SF Cayman International School  <br />Charlotte County Judicial Center – Punta Gorda, FL  <br />Life‐cycle cost analysis for mechanical systems and complete mechanical engineering design services for a new  <br />four story, 162,500 SF courthouse. Building is being served by a 600‐Ton full ice‐storage system, consisting of a  <br />20 modular tank farm with a rated capacity of 150‐Ton/Hrs per tank.   <br />Nassau County Courthouse – Nassau County, Florida  <br />HVAC design for a new 100,000 SF county courthouse – four courtrooms, Judicial Chambers and staff offices.   <br />This Facility included an atrium requiring Smoke Evacuation design.  <br />Collier County Government Center – New Courthouse Annex Building – Naples, FL  <br />HVAC design for a new (4) story Annex Building inclusive of a 5,000 SF Atrium.  Building was designed with  <br />infrastructure in place to expand to (8) stories total.  <br />Publix Headquarters Corporate Office – Lakeland, Florida  <br />HVAC analysis and systems concepts for the new Publix Corporate Facility. A 3‐story 600,000 SF office facility  <br />inclusive of a remote 1200 tons Central Chiller Plant.  <br />Doctor’s Charter School – Miami Shores, FL  <br />40,000 sq. ft. K‐12 School campus consisting of a 2‐story classroom building and administration building and a  <br />Multi‐purpose/cafeteria building. The school required 180‐tons of cooling capacity. An air cooled chilled water