Laserfiche WebLink
50 City of Sunny Isles Beach New Facility Qualifications for Architectural Design Services <br />   <br />ESI Consulting Engineers, Inc. <br />1315 NW 98th Court, Unit 15  <br />Doral, Florida 33172  <br />305.418.9177 phone   <br />305.418.9178 fax  <br />www.esiconsult.com  <br /> Karin N. de Cubas <br />Project Manager / Mechanical Designer <br />PROFILE  <br /> Ms. de Cubas has over 16 years of experience in the mechanical engineering design field.  Her diverse  <br />range of expertise comprises design for Commercial, Healthcare, Educational, and Institutional  <br />facilities, among others.  Her primary responsibilities include Project Management and coordination  <br />among the different disciplines, as well as with Clients.  <br />Karin also has extensive experience in the use of Computer Aided Design software, such as AutoCAD  <br />and Revit.  In addition, Karin is fully fluent in English, Spanish, and French.  <br />ESI CONSULTING ENGINEERS, INC.  <br /> 255 Alhambra Circle Office Building – Coral Gables, Florida  <br />HVAC Upgrade of the 600‐Tons Chiller Plant, including the replacement of (2) Cooling Towers, (2) Chillers, and  <br />related Condenser Water & Chilled Water Pumps, as well as Retrofit for ASHRAE 15 compliance, and a  <br />complete upgrade of the Building Management System with optimization control to maximize Plant efficiency.  <br />Brighton Administration Building –  Brighton, FL  <br />MEP Project Manager & HVAC Design for a 70,000 SF 4‐story office building for the Seminole Tribe of Florida.   <br />The building included an atrium which required Smoke Evacuation design.  <br />Brighton Educational Center –  Brighton, FL  <br />MEP Project Manager & HVAC Design for a new 45,000 SF facility educational center for the Seminole Tribe of  <br />Florida.  <br />Broward Health North – Deerfield Beach, Florida  <br />Project Manager for the HVAC Design of the new ±54,000 SF expansion of the Facility’s Emergency Department  <br />and Surgical Suite, and renovation of the Sterile Processing Department.  <br />Cayman International School, Camana Bay – Grand Cayman, Cayman Islands  <br />MEP Project Manager & HVAC Design of the ±20,000 SF phased expansion of the Cayman International School  <br />University of Miami, Medical Campus – Miami , Florida  <br />Project Manager & HVAC Design for the MEP‐FP Design at several areas of the Facility, including AHCA  <br />reviewed & approved projects:  <br />CRB Building  a new Multi‐Disciplinary Clinic at the Wellness Center, Dominion Tower, Hospital Clinic,  <br />Jackson Tower Building, Mailman Center, Sylvester Comprehensive Cancer Center, Vinciana Building  <br />EXPERIENCE AND RELEVANT WORK WITH OTHER FIRMS  <br /> Camana Bay (West Indian Club) – Grand Cayman, Cayman Islands  <br />Involved in the Master Planning and Design Development of 255‐acres Multi‐use development, including  <br />Standalone Chiller Plants with full power generation. Construction Documents for Phase 1A with an estimated  <br />construction budget cost of U.S $550 million.  Design included HVAC, Plumbing and Fire Protection.  The large  <br />capacity Chiller Plant for Phase 1A consists of (3) Cooling Towers with Condenser Water pumps, and (3) 700‐ <br />Tons Water Cooled Chillers with Primary and Secondary Chilled Water Pumps and an underground chilled  <br />water piping loop.  <br />City of Sunny Isles Beach City Hall & Police Complex – Sunny Isles Beach, FL  <br />Involved in the HVAC Design of a new 57,032 SF government complex inclusive of city hall, commission  <br />chambers, police facility, and a public library.  <br />Nassau County Courthouse – Nassau County, Florida  <br />New 100,000 SF county courthouse – four courtrooms, Judicial Chambers and staff offices.