My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 3:47:04 PM
Creation date
5/27/2015 2:16:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design Svcs for Facility at 18080 Collins Ave
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
64 City of Sunny Isles Beach New Facility Qualifications for Architectural Design Services <br />An Introduction to <br />OZ290026.15O_Sunny Isles Arch Design Srvcs_Civil.indd <br /> •Preparing conceptual water, sewer, paving, and grading plans to meet the client’s development criteria <br /> •Attending kick-off meetings with the client, architect, or other representatives. <br /> •Engineering design services for the preparation of construction documents includes: <br /> •On-site paving systems <br /> •On-site drainage and grading systems <br /> •On-site sewer collection and transmission systems <br /> •Off-site roadway improvements <br /> •Access drives <br /> •Off-site utility extensions <br /> •Hydrology studies <br /> •Preparation of final opinion of probable construction cost <br />Site Planning <br />Our staff has experience investigating and solving complex planning issues. Conducting field investigations, collecting and <br />analyzing background data, and establishing meaningful goals and objectives are all prerequisite steps in the planning <br />process. We are aware of environmental and financial constraints normally associated with the land development process <br />and are committed to developing plans that work for our clients. Maximizing the use of existing facilities is also an <br />important consideration when developing cost-effective plans. <br />Working in concert with our client, we provide land planning services to help create site plans with maximum development <br />yield. Once completed, our engineers review site plans for: <br /> •Groundwater conditions <br /> •Stormwater retention <br /> •Utilities availability <br /> •Easements <br /> •Ingress/egress conditions <br /> •Dimensional controls <br />Entitlements <br />The land use entitlement process is just one step in the project lifecycle; however the right approach can spell success <br />or failure for a project. Kimley-Horn’s civil engineering staff is experienced, knowledgeable, and resourceful with a proven <br />track record of successfully navigating projects through the often complicated entitlement process, especially in Florida. <br />Our staff recognizes that managing a project site during this entitlement process requires expertise, communication and <br />flexibility. Our relationships with city, county, and regulatory <br />agencies throughout Florida have helped us understand each development requirement to the benefit of our clients. <br />Steering through the entitlement process can be unpredictable; however Kimley-Horn uses its knowledge of the process <br />and local relationships to produce timely and favorable outcomes. <br />Choosing Kimley-Horn <br />As consultants, we take pride in building real partnerships with clients. That means you get an expert Kimley-Horn team <br />that delivers high-quality results on time and on budget, always advocates for your best interests, and works closely <br />with you and your entire development team throughout the site development process—from the earliest stages of due <br />diligence and entitlements to construction bidding, inspection, and final punch lists.
The URL can be used to link to this page
Your browser does not support the video tag.