Laserfiche WebLink
CRAIG A. SMITH & ASSOCIATES <br /> 7777 Glades Road • Suite 410 - Boca Raton,Florida 33434 <br /> CONSULTING ENGINEERS • S U R V E Y O R S •UTILITY L O C A T O R S•GRANT SPEOAUSTS W W W , C R A I G A S M I T H . C O M <br /> January 8, 2014 <br /> Ms. Helen Gray, P.E. <br /> City Engineer <br /> City of Sunny Isles Beach <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, FL 33160 <br /> RE: 174th Street Storm Water and Pavement Improvements <br /> Dear Ms. Gray, <br /> Per our meeting with Elka Linton-Dorsett and Bill Evans, the City has determined that <br /> they wish to perform a full reconstruction of 174th Street from Collins Avenue to North <br /> Bay Road and a complete milling and resurfacing from North Bay Road to the western <br /> terminus of 174th Street. The preference is also to extend the stormwater system to the <br /> west to tie into the North Bay Road outfall. In addition, the City would like to reconstruct <br /> sidewalk as needed to include ADA compliance, provide traffic calming devices, replace <br /> curb and gutter as needed, minimize median openings, add conduit sleeves to medians <br /> for future use, include a construction phasing plan to provide uninterrupted use of City <br /> Bus Shelters and landscape within the right of way and project limits. <br /> Due to the assumed subsurface conditions, a geotechnical evaluation will be required to <br /> determine the extent of the existing unsuitable material and establish a suitable <br /> roadway cross section to properly support the roadway infrastructure and its <br /> components. Depending on the outcome of the geotechnical testing, it may be <br /> necessary to provide a structural reinforcement to the base material in the form of geo- <br /> grid or alternative as well as possible structural support fog drainage structures. <br /> The City has also requested that CAS prepare the necessary contract documents and <br /> specifications for the project, oversee the bid process and contract award for <br /> construction. <br /> Lastly, it is understood that in the future, the City would like CAS to perform adequate <br /> site inspection and engineering services during construction to provide final project <br /> certification. <br /> CAS is pleased to provide the required services needed to complete the described <br /> project. The limits of the project will be on 174th Street beginning at the east end at <br /> Collins Avenue (SR-A1A) to western limits of 174th Street. Also included will be <br /> necessary Survey of North Bay Drive from approximately 260 feet north of 174th Street <br /> to approximately 300 feet south of 174th Street. The total linear footage of the project is <br /> approximately 2,515 feet, just less than one half mile. <br /> . 954 782 . 8222 - 561 . 7 ATTACHMENT "A" 3 05 . 461 .4410 <br /> 954 . 786 . 8927 791 . 98I8 <br />