My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2400
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:34:01 PM
Creation date
5/28/2015 11:33:52 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2400
Date (mm/dd/yyyy)
04/16/2015
Description
2nd Amd to Agmt w/Craig A. Smith: Engineering Srvs for 174th St. Roadway Imp
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SVM^Y f�f <br /> pt f � e City of Sunny Isles Beach•A � <br /> 18070 Collins Avenue <br /> • I S:: ': :le Beach, Florida 33160 <br /> r (^y Cr <br /> tie 'o iro�� (3 City Hall <br /> e''•o■ s�4 ""o (305)949-3113 Fax <br /> MEMORANDUM <br /> TO: The Honorable Mayor and City Commission <br /> VIA: Christopher J. Russo, City Manager <br /> FROM: Helen Gray, PE, City Engineer <br /> DATE: 1/16/2014 <br /> RE: A Resolution and Agreement with Craig A. Smith & Associates for <br /> Professional Services for the 174 Street Drainage Project <br /> RECOMMENDATION: <br /> We recommend City Commission approve the resolution. <br /> REASONS: <br /> The adopted City budget previously included a capital project to construct <br /> drainage improvements on 174 Street from Collins Avenue to approximately the <br /> west side of the Winston 600 Building. Given extensive deterioration of the <br /> roadway, in the FY 13/14 budget, City Commission approved expanding the <br /> project to include reconstructing substantial portions of the roadway in addition to <br /> constructing new drainage infrastructure. To implement this project, additional <br /> professional engineering services are needed and are detailed in the contract. <br /> Not included in this contract are possible future construction phase services that <br /> may include on-site field observation and inspections, project management and <br /> construction contract support services, and certification of the project as will be <br /> required by various permitting agencies. In addition, Luke's-Sawgrass Landscape <br /> will be preparing revised landscaping schemes for future City consideration and <br /> eventual implementation. <br /> COST: <br /> • Not to exceed $133,305.50 from Account No. 45.600-5691. <br /> Agenda Item No 10D <br /> • Date 1/16/2014 <br /> 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.