Laserfiche WebLink
Unfit Site Specific Instructions <br /> • Ihe.Yya Jaw bean <br /> Power: <br /> The CCU is to be powered by 120/240 VAC <br /> source defined as a 20 Amp branch circuit <br /> and must be protected on both ends by <br /> :ty <br /> certified branch circuit breakers. Install a _ _ • - -�° 1j! <br /> new 20A breaker box on the penthouse as«� <br /> interior wall and connect to the building ' t' <br /> feed by tying into the plug/junction box • 44. <br /> wiring. Ensure the CCU is not connected to e:•a=.L; ' <br /> a circuit protected by a GFCI breaker. The <br /> • wiring shall be sized In accordance with the I � � -��=��•? <br /> National Electrical Code,ANSI/NFPA 70,and <br /> /'or the prevailing local code. <br /> Network Connection: ' <br /> Itron has chosen to install a CCU with both a <br /> internal GPS and an internal WAN antenna. <br /> n/a <br /> GPS Antenna: <br /> Itron has chosen to install a CCU with both a <br /> internal GPS and an internal WAN antenna. n/a <br /> • CCU Installation: <br /> Install the CCU on a new 3"OD mast usin_ <br /> (.1110.0551: <br /> the standard Itron Pipe mount kit. Ground <br /> per Itron standards. i <br /> II u <br /> To mount the CCU/Repeater on a pipe <br />