Laserfiche WebLink
November 14, 2014 <br /> (Revised January 27, 2015) <br /> City of Sunny Isles Beach '- <br /> Attn: Ms. Elka Linton-Dorsett y: <br /> �%"/. <br /> 18070 Collins Avenue � ,�; <br /> Sunny Isles Beach, FL 33160 �d''r <br /> RE: Agreement for Professional Services s 'Y ,,,�/ <br /> Project Name: Utility Undergrounding Consultg, Collins Avenue- Phase ll <br /> Project Location: Sunny Isles Beach, FL _U✓`), ,%: •" ,. <br /> K&S Project 18073,Amendmen'#3„ ' '%" ",�•�-`, <br /> %ice% "ii�.i `%G <br /> Dear Ms. Linton-Dorsett: ,i/• <br /> ,/C,?, �/ r <br /> i !•// ,/,tom U�'%. <br /> y,v, --. . <br /> In accordance with discu��ssions✓�etween members of our.a bciation,yourself, and staff, this agreement <br /> between Keith and Sch��hars P.A�CONSULTANT ), andjOity of Sunny Isles Beach ("CLIENT" or "CITY") <br /> for professional servicesis;-submitted fo fyour consideration and approval. <br /> 4i 7 N ✓/, <br /> rtey'/� !% % <br /> N� %sue'' I. PURP.,OSE OF--AGREEMENT/PROJECT DESCRIPTION <br /> ,rJ'%fi5r�,/ „' 'rte . °/c/:,// '/1' <br /> f G.. , 4�J <br /> . The purpose of this Agreemen ;is to outl ne the scope of services recommended by CONSULTANT and <br /> accepted by CLIENT and to establ_ish the'co ttractual conditions between CONSULTANT and CLIENT with <br /> ; 'jV/ �/. <br /> respect to the proposed services.':;, r <br /> 'iii %' <br /> 1.0 INTRODUCTION/ ; <br /> .6 . ,�44/i <br /> CONSULTANT is currently prodding design services for undergrounding of overhead utilities. The project <br /> involves close coordination with Florida Power & Light (FPL) and a dependency upon their design files. <br /> FPL divided their design into two parts; north and south of 175th Street. The south file was received in April <br /> 2014, the north in September. In the interest of keeping the project on schedule, CONSULTANT advanced <br /> with design and survey services south of 175th during the 6 months between FPL submittals. However, <br /> with the second FPL submittal in September, both the north and south sections were revised. The revisions <br /> resulted in the need to modify easements (accounting for relocations, additions, and sizing), equipment <br /> modifications, additional meetings, field visits, and additional survey. In summary, much of the <br /> CONSULTANT's efforts in moving the project forward were negated with the FPL modifications. Through <br /> this amendment, CONSULTANT is requesting additional fees for extended efforts. <br />