My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2402
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 3:07:43 PM
Creation date
6/2/2015 3:07:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2402
Date (mm/dd/yyyy)
04/16/2015
Description
3rd Amd to Agmt w/Keith & Schnars FPL Overhead to Underground Conversion Proj
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 3—Bidding/Construction: <br /> Step 7. Bidding: The agreement with FP&L will result in a binding estimate as a turn-key project for <br /> FP&L improvements only. For a complete scope of services, the CITY will bid the Construction <br /> Documents as submitted for permit Upon selection of Contractor demonstrating certification from <br /> FP&L,the tariff will require modification to account for the diminished services provided by FP&L. <br /> Step 8. Construction: The key to a successful construction process is adherence to schedule <br /> • without cost increases and minimal disruption to the public. Public involvement, although a necessary <br /> component throughout the process, will be critical during the construction phase to provide public <br /> awareness and addressing concemslquestions. Depending upon the type and extent of <br /> improvement, certification for compliance with permits may be required. If desired, CITY could elect to <br /> have a full time project representative associated with the projects to act as a liaison between the CiTY <br /> and public or handle through staff. Finally, upon completion, as-builts are collected, reviewed and <br /> distributed,perrtiitt and contracts are closed out, bonds and final payments released. <br /> 3.0 SCOPE OF SERVICES <br /> Services to be provided by CONSULTANT under this initial Worst Authorization shall pertain to Project <br /> Assessment (Phase 1) only as related to approximately 2.2 miles of Collins Avenue. In addition to <br /> Undergrounding, CONSULTANT shall investigate the ongoing malfunction of streetlights along Collins <br /> Avenue with the intent of identify the process through which a solution can be implemented in conjunction <br /> with Undergrounding efforts. Tasks for subsequent .phases will be defined under separate work <br /> auttiohzatiori: Services for this work authorisation shall include the following. <br /> TASK 1 —Prepare Preliminary Cost Estimate <br /> Subtask 1.1 —Based upon kickoff meeting With the CITY, CONSULTANT shall compile budgetary cost <br /> estimates for the complete project. Further, with the level of input available from the identified utilities, <br /> CONSULTANT will prepare a preliminary schedule of the project for use in assisting the CITY in <br /> updating of.the Capital Improvement Plan (CIP). CLIENT understands that at this stag e, the project rs <br /> extremely.conceptual with minimal input provided by FP&L or other Utilities. Budget estimates are to <br /> be based upon general. assumptions validated where possible by FP&L and Utility providers. <br /> Estimates will identify general assumptions and qualifications. <br /> Subtask 1.2 - Attend one Staff and one Commission meeting to introduce the project, process, <br /> budget, and schedule via PoWerPoint prpseritation. <br /> Piofes onal Services Agreement <br /> Project Name: Utfhty Undergrounding Consulting <br /> Project Location:Suriny Isles Beach,FL <br /> iljrkink KEITH and.SCHNARS, P.A. K&S Proflosal No.:P509$.MK: <br /> ENGINEERS,PLANNERS, SURVEYORS Revised February 5,2013 'Page 4 <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.