My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2402
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 3:07:43 PM
Creation date
6/2/2015 3:07:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2402
Date (mm/dd/yyyy)
04/16/2015
Description
3rd Amd to Agmt w/Keith & Schnars FPL Overhead to Underground Conversion Proj
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> TASK 3-Existing Conditions <br /> Subtask 3.1 -CONSULTANT shall research existing atlases, right-of-way maps, survey, plat, and as- <br /> builts to assess completeness. Once compiled, information will be analyzed to determine if sufficient <br /> to create a base file for design within the corridor. Deficient information will be further analyzed to <br /> determine if absolutely necessary for a complete design. Where determined necessary but <br /> unavailable, a separate scope of services will be provided to obtain additional information. The <br /> purpose of this task is to gather information necessary to create an electronic base-file depicting <br /> existing conditions to be used for design. <br /> Subtask 3.2 - Upon gathering existing conditions information and establishing criteria for proposed <br /> design (Subtasks 2.1, 2.2 and 2.3), cost estimates and schedule assumptions can be further refined. <br /> CONSULTANT shall re-assess costs estimates and schedule assumptions provided within Subtask <br /> 1.1. CONSULTANT'S estimate shall be'preliminary in nature.and dependent upon the accuracy and <br /> Comprehensiveness of available information. <br /> Note: The above services do not include undergroundrng of overhead Transmission Lines. By their nature, <br /> undergrourmg of Transmission Lines involve more significant issues and are handled within a separate division within <br /> FP&L To avoid impacting progression of undergroundfng efforts, Transmission Lines will not be addressed within the <br /> above scope Of services. <br /> INFORMATION PROVIDE BY CLIENT: <br /> • Aerial exhibit of existing pole locations in CAD format. <br /> • Any available Atlas and/or as-built information for existing infrastructure. <br /> PAYMENT SCHEDULE _ <br /> TASK I DESCRIPTION PAYMENT TYPE PAYMENT AMOUNT <br /> . Subtask 1.1 I Budget Estimate Lump Sum $6200.00 <br /> Subtaslc 12 Project Presentation Lump Sum $2,820.00 <br /> Subtask 2.1 Mtg.'s w/FP&L T&M I $7,810.00 <br /> I Subtask 22 I Mtg.'s w/Utilities T&M $3,710.00 <br /> Subtask 2.3 Mtg's w/FDOT 1 T&M I $2,150.00 <br /> Subtask 2.4 Mtg.'s aid Coordination(CITY) I T&M $6,800.00 <br /> Subiask 2.5 I Clore Ughting lssu I T&M $7,100.00 <br /> 'Subtask 3.1 I Reseaith E*tiflg if forination I Luinp Sum I $10,670.00 <br /> Subtask 32 •Pietminary Cost Estirriate - Luirnp Sum $7,420.00 <br /> Protessional Services Agreement <br /> Project Name: Utility Undergrounding Consulting <br /> �,., Project Location:Sunny isles Beach,FL. <br /> EWE KEITH and SCHi�7ARS, P.A. K&S Proposal No.:P5098.MK <br /> s►1 Revised February 5,2013 Page 6 • <br /> ENGINEERS,PLANNERS,SURVEYORS <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.