|
Primitivo E. Conde, RA
<br />Senior Architect, Principal
<br />Professional Design Experience
<br />Mr. Conde has 26 years of experience in architecture leading master planning and design teams for a wide
<br />range of multifaceted projects including corporate office and retail /commercial developments, hospitality
<br />resorts, cruise terminal structures, residential and multiuse developments and specialty facilities in both
<br />domestic and international markets. Mr. Conde is also the VP of Design and Construction for BAP
<br />Development, an affiliate development arm of Bermello Ajamil the architectural /engineering service firm, a
<br />position he has held for the last 5 years. Projects have included luxury residential and multiuse developments
<br />and responsibilities that include complete project oversight, initial due diligence, assistance with project pro -
<br />forma and feasibility, consultant selection, contract negotiations, fee structures, in -house construction
<br />management and project close -out.
<br />Port of Miami Terminal 10 Expansion; Miami, FL - Project Manager on a 5- person team involved in the schematic
<br />PUBLICATIONS design, design development, construction documentation, construction supervision of a 90,000 -s.f. passenger
<br />Small House Book terminal facility within an existing warehouse building.
<br />Florida Energy House HOSPITALITY EXPERIENCE
<br />Book Hyatt Place /Summerfield Suites: Miami, FL - VP of Design and Construction in charge of the consultant team
<br />involved in the due diligence, feasibility, marketing, programming, master planning and design of a 10 story, 220
<br />EXPERIENCE room hotel and 5 -story 250 car parking garage designed to house a business hotel with an extended stay
<br />26 years component. There is a second parcel of land as part of the overall project designed that is comprised of a 70
<br />unit luxury residential tower of 15- stories including parking garage.
<br />Boca Raton Hotel and Club Marina Hotel; Boca Raton, FL - Lead designer /project manager on a 3- person team
<br />involved in the site planning, programming, schematic design, design development, and pricing package of a
<br />279 -room hotel that was part of an overall master planning and restoration effort for the existing hotel.
<br />RESIDENTIAL /MIXED -USE DEVELOPMENT EXPERIENCE
<br />EDUCATION
<br />Lakeview Center; WPB, FL - VP of Design and Construction in charge of the consultant team involved in the due
<br />Master of
<br />diligence, feasibility, marketing, programming, master planning and design of two 50 -story mix use towers
<br />Architecture
<br />comprised of a 9-story p arkin g p odium with 1,500 cars wrapped with luxury residential units, 57,000 s.f. of ground
<br />University of Florida,
<br />floor commercial /retail, 300,000 s.f. of offices, 350 luxury residential units and a 250 key business hotel.
<br />1987
<br />Premiere Towers; Miami, FL - VP of Design and Construction in charge of the consultant team involved in the
<br />Bachelor of Design in
<br />due marketing, feasibility, diligence,
<br />g Y 9. programming, master planning and design of two 50 story mix use towers
<br />Architecture,
<br />comprised of a 7 -story parking podium with 1,500 cars wrapped with 67,000 s.f. of flex space, 20,000 s.f. of
<br />University at Florida,
<br />round floor commercial /retail, 90,000 s.f. office and 550 luxury flat and loft t
<br />g ry type residential units.
<br />1984
<br />COMMERCIAL EXPERIENCE
<br />PROFESSIONAL
<br />Allstate Corporate Offices, Tampa, Florida - Lead designer /project manager on a 3- person team involved in
<br />REGISTRATION
<br />the planning, design, interior design and programming, design-development, construction documentation
<br />P 9, g g P g
<br />Registered Architect:
<br />di
<br />and construction supervision of two 5 -story office buildings of approximately 450,000 s.f. and 1,200 surface
<br />Florida - AR 0014406
<br />Parking spaces for
<br />Maryland - 16525
<br />Alabama -6934
<br />Military Town Center - Boca Raton,. FL - Lead designer /project manager on a 3- person involved in the
<br />Georgia - A 013118
<br />planning, design, design - development, construction documentation and construction supervision of a 10-
<br />Texas -22556
<br />story office building of approximately 210,000 s.f. and a 5 -story detached 550 space parking garage and
<br />New York -34852
<br />connector bridge. Building was purchased by W.R. Grace as their corporate headquarters and our team
<br />South Carolina -8410
<br />was hired to perform the programming design; construction documentation, FF &E selection and
<br />Michigan -
<br />construction supervision for their interior tenant fit -out.
<br />1301058235
<br />New Jersey-
<br />MARITIME FACILITY EXPERIENCE
<br />21 A101888300
<br />Port of Miami Terminal 12 Parking Garage; Miami, FL - Project Manager on a 3- person team involved in the
<br />Tennessee - 104572
<br />planning, design, construction documentation and construction supervision for a 5- level, 1,000 -car parking
<br />garage to support the existing terminal facility and RCCL corporate headquarters.
<br />NCARB Certified
<br />Port of Miami Terminal 10 Expansion; Miami, FL - Project Manager on a 5- person team involved in the schematic
<br />PUBLICATIONS design, design development, construction documentation, construction supervision of a 90,000 -s.f. passenger
<br />Small House Book terminal facility within an existing warehouse building.
<br />Florida Energy House HOSPITALITY EXPERIENCE
<br />Book Hyatt Place /Summerfield Suites: Miami, FL - VP of Design and Construction in charge of the consultant team
<br />involved in the due diligence, feasibility, marketing, programming, master planning and design of a 10 story, 220
<br />EXPERIENCE room hotel and 5 -story 250 car parking garage designed to house a business hotel with an extended stay
<br />26 years component. There is a second parcel of land as part of the overall project designed that is comprised of a 70
<br />unit luxury residential tower of 15- stories including parking garage.
<br />Boca Raton Hotel and Club Marina Hotel; Boca Raton, FL - Lead designer /project manager on a 3- person team
<br />involved in the site planning, programming, schematic design, design development, and pricing package of a
<br />279 -room hotel that was part of an overall master planning and restoration effort for the existing hotel.
<br />
|