Laserfiche WebLink
Primitivo E. Conde, RA <br />Senior Architect, Principal <br />Professional Design Experience <br />Mr. Conde has 26 years of experience in architecture leading master planning and design teams for a wide <br />range of multifaceted projects including corporate office and retail /commercial developments, hospitality <br />resorts, cruise terminal structures, residential and multiuse developments and specialty facilities in both <br />domestic and international markets. Mr. Conde is also the VP of Design and Construction for BAP <br />Development, an affiliate development arm of Bermello Ajamil the architectural /engineering service firm, a <br />position he has held for the last 5 years. Projects have included luxury residential and multiuse developments <br />and responsibilities that include complete project oversight, initial due diligence, assistance with project pro - <br />forma and feasibility, consultant selection, contract negotiations, fee structures, in -house construction <br />management and project close -out. <br />Port of Miami Terminal 10 Expansion; Miami, FL - Project Manager on a 5- person team involved in the schematic <br />PUBLICATIONS design, design development, construction documentation, construction supervision of a 90,000 -s.f. passenger <br />Small House Book terminal facility within an existing warehouse building. <br />Florida Energy House HOSPITALITY EXPERIENCE <br />Book Hyatt Place /Summerfield Suites: Miami, FL - VP of Design and Construction in charge of the consultant team <br />involved in the due diligence, feasibility, marketing, programming, master planning and design of a 10 story, 220 <br />EXPERIENCE room hotel and 5 -story 250 car parking garage designed to house a business hotel with an extended stay <br />26 years component. There is a second parcel of land as part of the overall project designed that is comprised of a 70 <br />unit luxury residential tower of 15- stories including parking garage. <br />Boca Raton Hotel and Club Marina Hotel; Boca Raton, FL - Lead designer /project manager on a 3- person team <br />involved in the site planning, programming, schematic design, design development, and pricing package of a <br />279 -room hotel that was part of an overall master planning and restoration effort for the existing hotel. <br />RESIDENTIAL /MIXED -USE DEVELOPMENT EXPERIENCE <br />EDUCATION <br />Lakeview Center; WPB, FL - VP of Design and Construction in charge of the consultant team involved in the due <br />Master of <br />diligence, feasibility, marketing, programming, master planning and design of two 50 -story mix use towers <br />Architecture <br />comprised of a 9-story p arkin g p odium with 1,500 cars wrapped with luxury residential units, 57,000 s.f. of ground <br />University of Florida, <br />floor commercial /retail, 300,000 s.f. of offices, 350 luxury residential units and a 250 key business hotel. <br />1987 <br />Premiere Towers; Miami, FL - VP of Design and Construction in charge of the consultant team involved in the <br />Bachelor of Design in <br />due marketing, feasibility, diligence, <br />g Y 9. programming, master planning and design of two 50 story mix use towers <br />Architecture, <br />comprised of a 7 -story parking podium with 1,500 cars wrapped with 67,000 s.f. of flex space, 20,000 s.f. of <br />University at Florida, <br />round floor commercial /retail, 90,000 s.f. office and 550 luxury flat and loft t <br />g ry type residential units. <br />1984 <br />COMMERCIAL EXPERIENCE <br />PROFESSIONAL <br />Allstate Corporate Offices, Tampa, Florida - Lead designer /project manager on a 3- person team involved in <br />REGISTRATION <br />the planning, design, interior design and programming, design-development, construction documentation <br />P 9, g g P g <br />Registered Architect: <br />di <br />and construction supervision of two 5 -story office buildings of approximately 450,000 s.f. and 1,200 surface <br />Florida - AR 0014406 <br />Parking spaces for <br />Maryland - 16525 <br />Alabama -6934 <br />Military Town Center - Boca Raton,. FL - Lead designer /project manager on a 3- person involved in the <br />Georgia - A 013118 <br />planning, design, design - development, construction documentation and construction supervision of a 10- <br />Texas -22556 <br />story office building of approximately 210,000 s.f. and a 5 -story detached 550 space parking garage and <br />New York -34852 <br />connector bridge. Building was purchased by W.R. Grace as their corporate headquarters and our team <br />South Carolina -8410 <br />was hired to perform the programming design; construction documentation, FF &E selection and <br />Michigan - <br />construction supervision for their interior tenant fit -out. <br />1301058235 <br />New Jersey- <br />MARITIME FACILITY EXPERIENCE <br />21 A101888300 <br />Port of Miami Terminal 12 Parking Garage; Miami, FL - Project Manager on a 3- person team involved in the <br />Tennessee - 104572 <br />planning, design, construction documentation and construction supervision for a 5- level, 1,000 -car parking <br />garage to support the existing terminal facility and RCCL corporate headquarters. <br />NCARB Certified <br />Port of Miami Terminal 10 Expansion; Miami, FL - Project Manager on a 5- person team involved in the schematic <br />PUBLICATIONS design, design development, construction documentation, construction supervision of a 90,000 -s.f. passenger <br />Small House Book terminal facility within an existing warehouse building. <br />Florida Energy House HOSPITALITY EXPERIENCE <br />Book Hyatt Place /Summerfield Suites: Miami, FL - VP of Design and Construction in charge of the consultant team <br />involved in the due diligence, feasibility, marketing, programming, master planning and design of a 10 story, 220 <br />EXPERIENCE room hotel and 5 -story 250 car parking garage designed to house a business hotel with an extended stay <br />26 years component. There is a second parcel of land as part of the overall project designed that is comprised of a 70 <br />unit luxury residential tower of 15- stories including parking garage. <br />Boca Raton Hotel and Club Marina Hotel; Boca Raton, FL - Lead designer /project manager on a 3- person team <br />involved in the site planning, programming, schematic design, design development, and pricing package of a <br />279 -room hotel that was part of an overall master planning and restoration effort for the existing hotel. <br />