Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />15, FIRM NAME AND LOCATION (City and State) <br />Sol -ARCH. Inc. <br />Masters of Architecture <br />14. YEARS EXPERIENCE <br />Project Manager 1 16 <br />. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida Certified General Contractor <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Staples Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(If applicable) <br />2007 <br />2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LXJ Check if project performed with current firm <br />e. <br />Project manager for new 20,300 sf retail facility, US GBC Gold rating first leed retail <br />building in Miami Dade County. Scope: design, production of working drawings, <br />visualization and construction administration. Project cost approximately $2,000,000.00 <br />(1) TITLE AND LOCATION (City and State) <br />1 (2) YEAR COMPLETED <br />The World Island Dubai, United <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Arab Emirates <br />2009 <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project manager for the design of multiple islands including Brunki, Arabian Nights, <br />Heart of Europe, Paraiso, Severnaya, and UK. Scope: master planning, zoning analysis and <br />design of mix -use facilities. (in conjuncion. with Bermello, Ajamil & Partners) <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Dr. Soler Baillo Plastic Surgery Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION ( /f applicable) <br />2008 <br />2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />C. <br />Project manager for an interior design project of 3,200 sf plastic surgery office, <br />.including two surgical suites. Scope: interior design and interior finish purchasing. <br />Project cost approximately $150,000. <br />(1) TITLE AND LOCATION Icily and State) <br />(2) YEAR COMPLETED <br />Autoway Chevrolet Clearwater, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTIONpf app licab le/ <br />2011 <br />2012 <br />d. <br />X <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project manager for image branding and renovation of existing 46,000 sf Chevrolet <br />dealership. Scope: facility design, manufactured image compliance, working drawings and <br />construction administration. Project cost was approx. $2,000,000.00 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Maroone Chevrolet of Miami Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />2012 <br />13) BRIEF DESCRIPTION /Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />e. <br />Project manager for image branding and renovation of existing 46,000 at Chevrolet <br />dealership. Scope: facility design, manufactured image compliance, working drawings and <br />construction administration. Project cost was approx. $5,000,000.00 <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />