My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sol-ARCH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
Sol-ARCH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2015 11:45:43 AM
Creation date
6/5/2015 11:44:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design Svcs for 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 15 -04 -01 <br />PHASE THREE: DESIGN DEVELOPMENT (DD) <br />All of the major decisions for the project will be made during Design Development. The sketches <br />prepared during Schematic Design will be thoroughly detailed and developed into a complete set of <br />design drawings. All the building materials, fixtures and finishes will be selected. A code review will be <br />performed to confirm that the project meets with the limits and requirements established by any and all <br />regulatory agencies. When Phase Three is complete, the project will be fully developed and you will be <br />asked to approve the Design Development package and authorize us to proceed to the next step, <br />preparing the Construction Documents. Project schedule will be provided. (Actual time in weeks or <br />months will be determined upon issuance of a project.) <br />FGL'r it { /L !J'P� �hGCal,� <br />EDU ATIOIN <br />*� P <br />FLORIDA <br />BUILDING <br />CODE <br />®n Ii n4 <br />Su"s Ili rie <br />NFPA <br />Sol -ARCH ►www.sol-arch.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.