My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACAI Assoc. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
ACAI Assoc. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2015 11:24:22 AM
Creation date
6/5/2015 11:55:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design for 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORMS & ATTACHMENTS <br />)kWleA111111ilk I <br />a s s o c i a t e s, i n c. 2937 W. Cypress Creek Rd. I Suite 200 1 Fort Lauderdale, FL 33309 <br />May 29, 2015 <br />Sunny Isles Beach Government Center <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />ADDENDUM I: DISPUTE DISCLOSURE - SUPPORTING DOCUMENTATION <br />ACAI Associates Inc. has two claims to report within the past five years. <br />In the first claim, the lawsuit is entitled "Thornton Construction Company, Inc. vs. LPI Realty, <br />Inc., et al ", case no. 0865431 CA 08, and this claim was settled and closed on March 28, 2011. <br />In this lawsuit, ACAI served as both, a defendant and a cross - plaintiff, as a result of its counter- <br />claim. This suit is summarized as follows: ACAI (the Architect) designed a 24,000 GSF building <br />(the LPI Headquarters located in Doral, Florida), four stories in height. The Construction <br />Contract was awarded to Thornton Construction Company, Inc. The Contractor failed to timely <br />complete the building in accordance with the Contract Time in its contract and walked off the <br />project. Subsequently the Contractor liened the property and sued the Owners, and the <br />Architect, claiming delays and seeking the remaining balance on its contract. The Owner <br />counter - claimed the Contractor seeking to recover the cost to complete the Project. In turn, <br />ACAI filed its compulsory counterclaims against the Contractor, seeking to recover the <br />additional costs resulting from extended professional services rendered during the delayed <br />completion of the Project. <br />The second claim is entitled "School Board of Broward County vs. ACAI Associates, Inc." and <br />this claim is summarized as follows: <br />ACAI (the Architect) developed a 25 acre bus maintenance compound consisting of parking for <br />approximately 370 school buses and a bus wash /bus fueling building, an administration building <br />for the bus drivers and a 2 story multiple bay bus maintenance facility. <br />Separate and non - concurrent construction contracts were awarded to Bergeron Land <br />Development (for paving and Construction Management) and TGSV (to build the Bus <br />Maintenance Facility). Bergeron Land Development made a claim which was dismissed with <br />prejudice on October 26, 2012. <br />RFQ No. 1504 -01 1 ARCHITECTURAL DESIGN SERVICES FOR A NEW FACILITY AT 18080 COLLINS ANTE. ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.