My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Synalovski Romanik Saye, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
Synalovski Romanik Saye, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2015 1:54:55 PM
Creation date
6/5/2015 1:34:36 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design Svcs for 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66 <br />West Broward YMCA <br />Located in Weston Regional Park, also designed by our firm, the 42,000 SF facility includes <br />a multi-use gymnasium, 7,000 SF fitness center, aerobics studio, spinning room, children’s <br />playrooms, and teen center. The activity center features a four-sided 28-foot climbing <br />tower, a traverse wall where children learn the skill of bouldering, ping-pong, foosball, <br />air hockey tables, video game station, and Internet access. The teen center includes a <br />big-screen TV and a library of movies, video games, Internet access, game tables, and <br />comfortable chairs. In July 2007, the aquatic center was completed to round out the <br />outdoor facilities with an Olympic-size pool, family fun pool, plunge pool for the <br />waterslide tower, and teaching area to fulfill the requirements of the Broward County <br />SWIM Central Grant. Our firm was responsible for managing the $7.5 million construction <br />cost. <br />Client YMCA of Broward County <br />Services Master Planning <br />Architectural Design <br />Interior Design <br />Contract Administration <br />Status Phase 1 completed 2005 <br />Phase 2 completed 2008 <br />Success A multifaceted gymnasium, with <br />activities and fitness centers for <br />all ages and an expansive aquatic <br />center with swim teaching facilities, <br />serves as a diversified recreational <br />hub for the community. <br />Play
The URL can be used to link to this page
Your browser does not support the video tag.