Laserfiche WebLink
,,_�S� S��s City of Sunny Isles Beach <br /> , r a-' n 18070 Collins Avenue <br /> `� - _.14 Sunny Isles Beach, Florida 33160 <br /> s, ' p_l ` .eAC. CT (305) 947-0606 City Hall <br /> Pc`r: of su FLO K �'`'�; (305)949-3113 Fax <br /> MEMORANDUM <br /> TO: The Honorable Mayor and City Commission <br /> VIA: Christopher J. Russo, City Manager <br /> FROM: Bill Evans, Public Works Director <br /> DATE: 10/16/2014 <br /> RE: Resolution Approving Change Order No. 1 with Pac Comm, <br /> Inc. for Emergency Seawall Repair <br /> RECOMMENDATION: <br /> Staff is recommending the City Commission approve the attached resolution. <br /> REASONS: <br /> Per Resolution 2014-2295, an agreement with Pac Comm Inc. was ratified that <br /> provided for emergency construction services related to the failure of a portion of <br /> the seawall at the Intracoastal Park South property. Since the remaining seawall <br /> on Intracoastal Park South as well as the entire seawall on Intracoastal Park <br /> North are of the same vintage and no record drawings are available, additional <br /> evaluation of seawall conditions was performed by the City's consultant, Calvin <br /> Giordano and Associates. Inc. (CGA). CGA determined that additional repair or <br /> replacement work is needed on both the North and South Intracoastal Parks. <br /> DERM has approved the revised limits of repair and replacement. <br /> Pac Comm, Inc. has estimated the additional quantities and cost which have <br /> been reviewed by CGA. Since the original Pac Comm calculations for additional <br /> costs did not include replacing the backfill lost from behind the walls, this <br /> additional work can be performed by them and has been estimated and priced. <br /> The Change Order amount is $377,557.95 plus $23,425.00 for backfill which <br /> totals $400,982.95. <br /> Staff also expects future restoration costs for the parks that may include fine <br /> grading, sod, irrigation, landscaping, electrical facilities, fencing, and hardscape <br /> components. Future final restoration costs will be determined seawall <br />