Laserfiche WebLink
I <br /> 9/9/2015 <br /> Samson Oceanfront Park Improvements <br /> City of Sunny Isles Beach, Florida <br /> (Revised 2015-08-10) <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON <br /> THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. <br /> BID REF.FDOT PAY DESCRIPTION UNIT EST- UNITICOST EXTENDED COST <br /> ITEM# ITEM# QUANTITY <br /> 26 N/A (Grinder Pump Electrical Panel&Controller LS I $ 12,656.00 I $ 12,656.00 <br /> 27 N/A (Retrofit existing pipe(at restroom connection) LS I $ 500.00 I $ 500.00 <br /> 28 N/A Furnish&Install-7'PVC Sanitary Sewer Force LF 25 $ 106.00 1 $ 2,650.00 <br /> Main <br /> 29 N/A (Furnish&Install-Air Release Valve EA ( 1 $ 5,000.00 I $ 5,000.00 <br /> Furnish&Install-6"PVC Gravity Sewer Lateral <br /> 30 N/A including but not limited to replacement and/or LF 335 $ 94.00 $ 31,490.00 <br /> repair of damaged wall segments impacted by <br /> sanitary installation and wall plaque <br /> 31 N/A Furnish&Install-Encasing Pipe LF 50 ( $ 225.00 I $ 11,250.00 <br /> Furnish&Install-8"DIP Sanitary Sewer Pipe, <br /> 32 N/A Includes polyethelene encasing pipes and fittings LF 80 $ 225.00 $ 18,000.00 <br /> per plans <br /> Cut&Cap Existing laterals at the main <br /> 33 N/A (contractor to verify lateral location and depth EA 5 $ 5,625.00 $ 28,125.00 <br /> prior to excavation) <br /> 34 N/A I Furnish&Install Manhole-In Public Right-of-Way EA 1 $ 15,000.00 I $ 15,000.00 <br /> 35 N/A Furnish&Install Manhole-In Private Right-of-Way EA 3 $ 6.250.00 $ 18,750.00 <br /> 36 N/A (Furnish&Install Conflict Structure-<10' EA 1 $ 15,000.00 I $ 15,000.00 <br /> 37 N/A Furnish&Inttall-Clean out with Trafific Rated EA 3 $ 1,875.00 1 $ 5,625.00 <br /> cover <br /> Temporary portable ADA compliant Restroom <br /> Trailer(National Construction Rentals Standard <br /> 38 N/A Comfort Station on Skidds or approved equal) LS 1 $ 48,750.00 $ 48.750.00 <br /> including but not limited to temporary utilities, <br /> servicing and weekly pump outs(at a minimum) <br /> by a licensed disposal contractor. <br /> Subtotal of Sanitary Sewer $284,046.00 <br /> STRUCTURAL <br /> 39 N/A Furnish&Install Boardwalk-Wood-Polymer LS 1 $ 32,00000 $ 32,000.00 <br /> decking,see plans for specifications <br /> ITB 15-05-01 Samson Oceanfront Park Improvements Page 3 Addendum 5 Bid Form(Rev 0810 2015) <br />