Laserfiche WebLink
9/9/2015 <br /> Samson Oceanfront Park Improvements <br /> City of Sunny Isles Beach, Florida <br /> (Revised 2015-08-10) <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON <br /> THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. II <br /> BID REF.FDOT PAY DESCRIPTION UNIT Ems' UNIT COST EXTENDED COST <br /> ITEM# ITEM# QUANTITY <br /> Structural Modifications to restroom areas; <br /> 51 N/A includes but not limited to.concrete,beams,tie- LS 1 $ 51.800.00 $ 51,800.00 <br /> ins. <br /> Bus Shelter Pad and Footing-Furnish and Install <br /> 52 522-4 per Miami-Dade County Transit,Florida Building LS 1 $ 2,081.00 $ 2,081.00 <br /> Code and City of Sunny Isles Beach regulations <br /> Subtotal for Structural $580,502.00 <br /> HARDSCAPE <br /> Pavers,Architectural,Sidewalk-8"X 8-Concrete <br /> Pavers.80mm;3000 psi.;Cream Shell Stone;90 <br /> 53 526-1-2 Stack Bono Rectangles.(Cost includes concrete SY 1040 $ 180.00 $ 187,200.00 <br /> and compacted limerock base for pavers in the <br /> driveway and Samson path.) <br /> Pavers,Architectural,Sidewalk-8"X 8"Concrete <br /> 54 526-1 2 Pavers,80mm;3000 psi.;Cream Shell Stone;90 SY 97 $ 150.00 $ 14,550.00 <br /> Stock Bono Rectangles.(Cost includes sand base <br /> for pavers along Collins Ave sidewalk) <br /> Pavers,Architectural,Sidewalk-8"X 8"Concrete <br /> Pavers.80mm";3000 psi.;Camel Shell Stone:90 <br /> 55 526-1-2 Stack Bono Rectangles.(Cost includes concrete 5Y 1220 $ 180.00 $ 219,600.00 <br /> and compacted limerock base for pavers in the <br /> driveway and Samson path <br /> Pavers,Architectural,Sidewalk-8"X 8"Concrete <br /> 56 526-1-2 Pavers,80mm;3000 psi.;Camel Shell Stone;90 SY 97 $ 150.00 $ 14,550.00 <br /> Stack Bono Rectangles.(Cost includes sand base <br /> for pavers along Collins Ave sidewalk) <br /> Pavers.Architectural,Sidewalk-4"X 8"Concrete <br /> Pavers.80mm";3000 psi.;8"Soldier Course; <br /> 57 526-1-2 Camel/Cream Shell Stone.(Cost includes 5Y 150 $ 180.00 $ 27,000.00 <br /> concrete and compacted limerock base for <br /> pavers in the driveway and Samson path.) <br /> ITB 15-05-01 Samson Oceanfront Park Improvements Page 5 Addendum 5 Bid Form(Rev 08102015) <br />