My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Responses
>
West Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 4:33:14 PM
Creation date
9/9/2015 4:21:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson Oceanfront Park Improvements
Bid No. (xx-xx-xx)
15-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/9/2015 <br /> Samson Oceanfront Park Improvements <br /> . City of Sunny Isles Beach, Florida <br /> (Revised 2015-08-10) <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON <br /> THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. <br /> BID REF.FOOT PAY DESCRIPTION UNIT EST' UNITICOST EXTENDED COST <br /> REM d ITEM it QUANTITY <br /> 189 N/A ISCH 40 Golvanized Steel(Furnish and Install) I LF I I $ I 30.00 I $ 300.00 <br /> 190 N/A ISCH 40 PVC(Furnish and Install) LF 960 I 5.70 I $ 5,472.00 <br /> 191 N/A 'Grounding Location(Furnish and Install) EA 1 $ I 250.00 I $ 250.00 <br /> I <br /> Subtotal of Irrigation $25,721.00 <br /> II <br /> PROJECT CLOSE OUT <br /> I <br /> 192 N/A As-built record drawings(electronic and hard LS I 1 $ I 15.000.0 I $ 15,000.00 <br /> I I I I I <br /> Subtotal of Project Close Out $15,000.00 <br /> I <br /> 1 <br /> BID SUBTOTAL: $ 2,507,931.70 <br /> I <br /> CONTINGENCIES I <br /> 193 N/A Project Contingency-to be used at the sole LS I 10% $250.793.17 <br /> discretion and direction of the Owner <br /> 194 N/A Permit Allowance 1 LS 1 1 I $30,000.00 <br /> I <br /> BID TOTAL: $2,788.724.87 <br /> NOTE: <br /> I <br /> The Quantities shown in this Bid Form are estimates only.They are generally representative of the work that will be required by the Contractor. <br /> The Contractor shall be responsible for veryfying all quantities prior to bid.The Contractor shall ensure that ALL work for the proposed <br /> improvements is completed for the TOTAL price submitted on this Bid Form.The Bidder,by signing this Bid Form and Contract fully <br /> acknowledges that he/she will redeye no additional compensation(no overhead,no anticipated profits'etc),other than the bid unit price of <br /> these Items times the number of items authorized,ordered, installed and accepted by the City;unless It can be proven and agreed to In writing <br /> by the City that additional work is required(prior to commencement of additional work). <br /> ITB 15-05-01 Samson Oceanfront Park Improvements Page 15 Addendum 5 Bid Form(Rev 0810 2015) <br />
The URL can be used to link to this page
Your browser does not support the video tag.