My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Responses
>
West Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 4:33:14 PM
Creation date
9/9/2015 4:21:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson Oceanfront Park Improvements
Bid No. (xx-xx-xx)
15-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 9/9/2015 <br /> Samson Oceanfront Park Improvements <br /> City of Sunny Isles Beach, Florida <br /> • <br /> (Revised 2015-08-10) <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON <br /> THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. <br /> BID REF.FDOT PAY DESCRIPTION UNIT EST' UNIT I COST EXTENDED COST <br /> ITEM 0 ITEM ft QUANTITY <br /> DEMOLITION I <br /> 1 110-1-1 I Clearing and Grubbing LS I $ 5,375.001 $ 5,375.00 <br /> Removal of existing park ammenities,unless • <br /> otherwise noted in the plans;i.e.benches,light <br /> 2 N/A poles,conduit and landscape up lights.trees and LS 1 $ 6,780.00 $ 6.780.00 <br /> landscape with electrical outlets and shower <br /> assemblies per plan sheets <br /> Removal of existing concrete pavement along <br /> 3 1144 Collins Ave and within Samson Park(Existing SY 1100 $ 12.50 $ 13,750.00 <br /> reinforcement unknown.Contractor to <br /> investigate prior to bid) <br /> Removal of existing concrete slab and <br /> 4 N/A reinforcement beneath existing pavilion Sy 410 $ 12.50 $ 5,125.00 <br /> 5 N/A Removal of existing bathroom walls,floors and I $ 7,375.00 $ 7,375.00 <br /> amenities as shown on the plans <br /> 6 N/A Removal of existing 6"sanitary main IF 350 $ 10.00 $ 3,500.00 <br /> 7 N/A Removal of existing fence along north and south LS I $ 1,125.00 $ 1.125.00 <br /> side of Samson Park <br /> Removal of existing wooden posts fence in <br /> 8 LS 1 $ 250.00 $ 250.00 <br /> pavillion area per plan sheet <br /> 9 Replace existing wooden fence posts along LF 15 $ 50.00 $ 750.00 <br /> eastern park limits for new boardwalk <br /> Relocation of existing bus shelter.Reinstallation to <br /> be in accordance with Miami-Dade County <br /> Transit criteria.Costs also include temporary bus <br /> 10 N/A stop relocation(location to be coordinated by EA I $ 2125.00 $ 2,125.00 <br /> Contractor with the City and Miami-Dade <br /> County Transit)and transport of bus shelter to and <br /> from the City Public Works facility for temporary <br /> storage during construction <br /> Subtotal foriDemolition $46,155.00 <br /> SITE CIVIL I <br /> 11 I 101-1 IMabilization and Demobilization I LS I I I $ 1 25.000.00 I $ 25,000.00 <br /> ITB 15-05-01 Samson Oceanfront Park Improvements Page 1 Addendum 5 Bid Form(Rev 08 10 2015) <br />
The URL can be used to link to this page
Your browser does not support the video tag.