Laserfiche WebLink
9/9/2015 <br /> Samson Oceanfront Park Improvements <br /> City of Sunny Isles Beach, Florida , <br /> (Revised 2015-08-10) <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON <br /> THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. <br /> BID REF.FDOT PAY DESCRIPTION UNIT . EST' UNIT I COST EXTENDED COST <br /> ITEM N ITEM ft QUANTITY <br /> 26 N/A (Grinder Pump Electrical Panel&Controller LS I $ 12,656.00 I $ 12,656.00 <br /> 27 N/A (Retrofit existing pipe(at restroom connection) LS 1 $ 500.00 I $ 500.00 <br /> 28 N/A Furnish&Install-7 PVC Sanitary Sewer Force IF 25 $ 106.00 $ 2,650.00 <br /> Main <br /> 29 N/A IF urnish&Install-Mr Release Valve EA 1 $ 5,000.00 I $ 5,000.00 I <br /> Furnish&Install-6"PVC Gravity Sewer Lateral <br /> 30 N/A including but not limited to replacement and/or IF 335 $ 94.00 $ 31 490.OD <br /> repair of damaged wall segments impacted by <br /> sanitary installation and wall plaque <br /> 31 N/A (Furnish&Install-Encasing Pipe LF 50 $ 225.00 I $ 11,250.00 <br /> Furnish&Install-8"DIP Sanitary Sewer Pipe, <br /> 32 N/A Includes polyefhelene encasing pipes and fittings LF 80 $ 225.00 $ 18,000.00 <br /> per plans <br /> Cut&Cap Existing laterals at the main <br /> 33 N/A (contractor to verify lateral location and depth EA 5 $ 5,625.00 $ 28.125.00 <br /> prior to excavation) <br /> 34 N/A Furnish&Install Manhole-In Public Right-of-Way EA 1 $ 15,000.00 I $ 15,000.00 <br /> 35 N/A Furnish&Install Manhole-In Private Right-of-way EA 3 $ 6,250.00 I $ 18.750.00 <br /> 36 N/A Furnish E.Install Conflict Structure-<10' EA I $ 15,000.00 I $ 15.000.00 <br /> 37 N/A <br /> Furnish F.Intsall-Clean out with Tra52lc Rated EA 3 $ 1,875.00 I $ 5.625.00 <br /> cover <br /> Temporary portable ADA compliant Restroom <br /> Trailer(National Construction Rentals Standard <br /> 38 N/A Comfort Station on Skidds or approved equal) LS I $ 46.750.00 $ 48150.00 <br /> including but not limited to temporary utilities, <br /> servicing and weekly pump outs(at a minimum) <br /> by a licensed disposal contractor. <br /> Subtotal of Sanitary Sewer $284,046.00 <br /> STRUCTURAL I <br /> 39 N/A Furnish&Install Boardwalk-Wood-Polymer LS i $ 32.000.00 $ 32,000.00 <br /> decking,see plans for specifications <br /> ITB 15-05-01 Samson Oceanfront Park Improvements Page 3 Addendum 5 Bid Form(Rev 08 10 2015) <br />