Laserfiche WebLink
9/9/2015 <br /> Samson Oceanfront Park Improvements <br /> City of Sunny Isles Beach, Florida <br /> (Revised 2015-08-10) <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON <br /> THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. <br /> BID REF.FDOT PAY DESCRIPTION UNIT EST. UNITjCOST EXTENDED COST <br /> ITEM p ITEM# QUANTITY <br /> Furnish&Install hose bib,MIFAB Model=MHY-35- <br /> 69 N/A 3.Stainless Steel Encased Wall Hydrant,Moderate EA 2 $ - $ - <br /> climate with integral vacuum breaker <br /> Furnish&Install Shower Fixture-METCRAFT Model <br /> 70 N/A 8600.includes shower head and valve(No soap EA 5 $ - $ - <br /> dish) . <br /> • <br /> 71 N/A Retrofit existing 2"domestic water backflow EA 1 $ I $ <br /> preventer <br /> 72 N/A Furnish&Install-Drinking Fountain,to match EA 1 $ $ <br /> existing <br /> 73 N/A Furnish&Install-Restroom Floor Drain,MIFAB EA 3 $ I - $ - <br /> Model F1000-5 <br /> Furnish&Install-wall cleanout,MIFAB CI 430-RD <br /> 74 N/A with bronze plug.stainless steel cover,and screw EA 1 $ - $ - <br /> 75 N/A Furnish&Install-Floor cleanout,MIFAB 01000 EA 1 $ $ <br /> with adjustable stainless steel and bronze plug <br /> Banter free bi-level electric cooler,ELKAY Model <br /> 76 N/A =EZSTLBC.NSF/ANSI 61 Compliant with front& EA I $ 84,125.00 $ 84,125.00 <br /> side push pads and bi-level carrier eauql to <br /> MIFAB Series MC-33-2 <br /> Subtotal of Restroom 1 Plumbing $93,805.00 <br /> rRESTROOM ELECTRICAL 4 <br /> 77 N/A Furnish&Install Electrical Hand Dryer,Dyson EA 4 $ 1,312.00 $ 5,248.00 <br /> Model Arblade db,white,includes junction box <br /> 78 N/A Furnish&Install-Electrical Control Panels in EA 2 $ 1,190.00 $ 2,380.00 <br /> storage room <br /> 79 N/A Furnish&Install-Lighting Control Panels in storage EA 3 $ 4,812.00 $ 14,436.00 <br /> roam <br /> Furnish&Install-Wood Telephone backboard in <br /> 80 N/A storage room,includes all features per detail,see EA 1 $ 1.718.00 $ 1,718.00 <br /> plans <br /> ITB 15-05-01 Samson Oceanfront Park Improvements Page 7 Addendum 5 Bid Form(Rev 0810 2015) <br />