Laserfiche WebLink
RFQ No. 15-08-02 <br />Construction Management at Risk for Government Center Annex at 18080 Collins Avenue 33 <br />AL VILLARREAL, LEED AP BD+C <br />suPerintendent <br />BACKGROUND <br />Al Villarreal has 32 years of experience in the construction industry and possesses extensive <br />experience on multi-million-dollar projects; engineering, estimating, safety procedures, multiple <br />crew supervision, contract negotiation, trade scope writing and subcontracting procurement/ <br />assessment. He is certified in many areas of equipment operation, OSHA 30-Hour safety training. <br />As Superintendent, his duties include quality control oversight for all subcontractors, coordination <br />of weekly safety meetings and monthly safety inspections, on-site coordination of subcontractor <br />performance, communication and teamwork, preparation of two-week look ahead schedule and <br />filing and journaling meeting minutes, job logs and daily reports. <br /> <br />EXPERIENCE <br />Miramar West Center, Miramar, FL — New construction of a new 4-story, 80,000 s.f. building <br />including classrooms, science labs, student academic support and administration space. Provides <br />approximately 580 parking spaces. The project was built on a 20 acre site that includes approximately <br />9.5 acres of buildable, non-wetland conservation easement area. Design/Build, $23.0 million. <br /> <br />Florida Department of Law Enforcement Evidence Warehouse and Parking Garage, Miami, FL — <br />New construction of a 3.5-story, tilt-up office building, 10,288 s.f. evidence warehouse, and 350-space <br />parking garage. $16.0 million. <br /> <br />Lee County Courthouse and Parking Garage, Ft. Myers, FL - This project consists of six phases. <br />Phase I and II involved installation of three new elevators with lobbies and IT server room. In Phase III, <br />modifications to the Central Energy Plant were completed. Phases IV & V involved the construction <br />of a new 2-story addition which houses shipping and receiving on the ground floor and a kitchen/ <br />cafeteria on the second. Phase VI, was the construction of a new 10-story Criminal Courts complex <br />that houses 17 courtrooms. CM at Risk, $160.0 million. <br /> <br />Pompano Beach Parking Garage, Pompano Beach, FL — Design and construction of a 239,646 s.f., <br />500-space parking garage in close proximity to the beach. The new garage is the corner piece of the <br />Pompano Beach Pier Park master development which is planned as a new city destination with new <br />restaurants, retail shops, and a potential hotel establishment. Design/Build, $19.8 million. <br /> <br />Port of Miami Parking Garage, Miami, FL - New construction of a 750-space parking garage that <br />also included site utilities. $6.0 million. <br /> <br />5505 Waterford Office Building & Garage Burger King HQ, Miami, FL — Facility consisted of a <br />9-story, 231,000 s.f., Class A office building as well as a 214,000 s.f., 4-level, 682-car parking garage <br />and associated site development, including entrance fountain. Interior buildout consisted of a <br />full service restaurant and test kitchen on the top floor, with office space, conference facilities, <br />entertainment lounge, and raised access computer server room with redundant generator and <br />battery backup systems. $26.9 million. <br /> <br />701 Waterford Office Building & Garage, Miami, FL — Facility consisted of a Class A, 10-story, <br />260,000 s.f. office building built using PSI structure with architectural precast panels. Work also <br />included a 247,173 s.f. parking garage. $23.1 million. <br /> <br />Fort Lauderdale/Hollywood Airport Car Rental Center, Ft. Lauderdale, FL — New construction of a <br />state-of-the-art car rental facility with over 4,000 parking spaces. $158.0 million. <br />EDUCATION <br />Business Administration, <br />Northeastern University <br /> <br />Business Administration, <br />Florida Atlantic University <br /> <br />LICENSES/REGISTRATIONS <br />LEED AP BD+C <br /> <br />OSHA 30-Hour <br /> <br />First Aid/CPR <br /> <br />Tilt Up/Concrete, ACI <br />Certification <br /> <br />YEARS OF EXPERIENCE <br />32 <br />Experience <br />Section J