My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emerald Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Emerald Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:25:13 AM
Creation date
9/24/2015 10:21:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. RELATED EXPERIENCE <br />The existing Corporate Pavilion will be renovated <br />to include the addition of a second story structure <br />designed in accordance with the Florida Building Code. <br />The first floor will be renovated to accommodate up to <br />700 patrons in a banquet-style setting. The second floor <br />will be designed to accommodate up to 300 patrons in <br />a banquet-style setting, including an exterior covered <br />balcony to accommodate up to 100 patrons <br />Emerald Construction is responsible for renovating <br />existing ground level restrooms; converting an existing <br />canopy covered ground floor area into an enclosed <br />space and enlarging the footprint; renovating the <br />ground level to accommodate Corporate Conference <br />Hall/Multi-purpose Room for reception, conference <br />and training. Adding a second level assembly area <br />with the ability to subdivide into smaller conference <br />areas. Providing an exterior covered balcony on the <br />second level, constructing warming kitchens on both <br />first and secolevels. Constructing a new lobby, elevator <br />and stairway, as required by Florida Code. Installing <br />new restrooms on the second level; providing new <br />storage rooms for the ground and second levels; <br />Adding reception areas on the ground and second <br />levels. Constructing office space area on the second <br />floor, comprised of private offices, conference room, <br />break room, etc.; and installing mechanical, electrical, <br />telephone and data room improvements. <br />NAME AND LOCATION OF PROJECTCity of Miramar <br />SIZE OF PROJECTVarious <br />CLIENTS CONTACT INFORMATIONDenise ConeProject Manager Construction and Facilities Management j g j <br />Department <br />City of Miramar 2200 Civic Center pp <br />PlaceMiramar, Florida 33025y y <br />954.602.3165 dcone@miramar.fl.us <br />PROJECT ARCHITECTSRS ArchitectureMerill Romanik, AIA1800 Eller DriveFort Lauderdale, FL 33316Phone: 954.961-6806Fax: 954.961.6807mromanik@synalovski.com <br />CONTRACT TERMJanuary 2015 - TBD <br />FIRM’S RESPONSIBILITY ON THEPROJECTCM@Risk <br />RESULTS OF PROJECTUnder Construction <br />COST OF PROJECT$ 2,800,000
The URL can be used to link to this page
Your browser does not support the video tag.