MDCPS procured Emerald Construction thru a Hard <br />Bid Selection method to perform the shell construction <br />addition of 12 new classroom additions on top of an <br />existing 4 floor parking garage while maintaining the <br />garage and existing school occupied/operational <br />during construction. The project time frame was seven <br />months from start to completion with 60 days to Final <br />Completion. The schedule required coordination of 10- <br />12 hour shifts to avoid conflicts with testing sessions <br />that were on-going through-out the school year. <br />The building was a composite structure with an <br />exterior combined of steel framing, in-fill masonry, <br />and composite floor slab in order to minimize weight. <br />Additional pile foun-dations had to be installed at the <br />base of the garage which involved the use of low-over- <br />head pile rig. This rig could drill a minimum of 45’ with <br />13’ of overhead clearance, also a 16” shear wall was <br />constructed through the existing parking garage to <br />add lateral support of the new building addition. Lastly, <br />a new 5 story stair structure with bridge connec-tions <br />to the new addition and the existing facility had to be <br />constructed in order to facili-tate the future student <br />traffic routes and provide proper egress means. <br />NAME AND LOCATION OF PROJECT <br />Miami Dade County Public Schools <br />Norman S. Edelcup Sunny Isles K-8 Classroom <br />Addition <br />SIZE OF PROJECT <br />13,400 sq-ft. <br />CLIENTS CONTACT INFORMATION <br />Raul F. Perez <br />Executive Director of Construction <br />Management <br />Miami-Dade County Public Schools, <br />Office of School Facilities Construction <br />1450 NE 2nd Ave, Miami, FL 33132 <br />Phone: 305-995-4701 <br />E-mail: RPerez6@dadeschools.net <br />DESCRIPTION OF WORK <br />New 1 Story Classroom Addition above the <br />existing 4 story parking garage equaling <br />approximately <br />13,400 sq-ft. <br />CONTRACT TERM <br />February 2011/ August 2013 <br />FIRM’S RESPONSIBILITY ON THE PROJECT <br />CM@Risk <br />RESULTS OF PROJECT <br />Complete & Occupied <br />COST OF PROJECT <br />$3,589,201