My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emerald Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Emerald Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:25:13 AM
Creation date
9/24/2015 10:21:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NAME AND LOCATION OF PROJECT11241 SW 184 Street Miami, FL. 33157 <br />SIZE OF PROJECT20,000 SF <br />CLIENTS CONTACT INFORMATIONMichael HartVice President of Customer ServiceSunrise Community Inc.9040 Sunset Drive <br />Miami FL 33173Phone: 305-593-9040Fax: 305-598-8240mhart@sunrisegroup.org <br />PROJECT ARCHITECTAlbert F. PerezCBI Consulting Inc.13375 SW 128th Street 110 g g <br />Miami FL 33176Phone: 617-268-8977Fax: 305-951-7100aperez@cbiconsultinginc.com <br />CONTRACT TERMJuly 2014 - Present <br />FIRM’S RESPONSIBILITY ON THEPROJECTHard Bid Selection <br />RESULTS OF PROJECTUnder Construction <br />COST OF PROJECT$ 2,456,407.55 <br />KEY PREOFSSIONALS INVOLVEDRamiro Gamez, Project Manager <br />Sunrise Community selected Emerald Construction <br />Corp. to provide Construction of a new Senior Day Care <br />Faciliity of approximately 20,000 square-feet on a 3 acre <br />lot. This included providing all the HVAC Diffusers work <br />shown on the plans, listed in the specification, and <br />installation of a complete assembly in every way, with all <br />reinforcing, pinning, and finishes. We are coordinating <br />the HVAC Diffusers work with all the othertrades for <br />the project. Provide all demolition and disposal work <br />to complete the HVAC Diffusers work. Patch to match <br />all adjacent surfaces that are disturbed, left exposed, <br />or unfinished. Provide all primary and secondary steel <br />supports and hangers as shown on the drawings and/ <br />or as required to support equipment, ductwork, piping, <br />exhaust fans, or any other materials provided under <br />the work of the specifications. This includes designing, <br />furnishing and installing all miscellaneous metal work <br />associated with the system, and related items as <br />indicated on the drawings and/or <br />as specified by the owner. <br />F. RELATED EXPERIENCE
The URL can be used to link to this page
Your browser does not support the video tag.