My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emerald Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Emerald Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:25:13 AM
Creation date
9/24/2015 10:21:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This was a design-build project for the United <br />Neighborhood Organization (UNO). This fast track <br />project was awarded in November 2011 and the <br />schedule required the project to be designed, bid, and <br />built for occupancy by UNO in the Fall of 2012. This type <br />of schedule had never been attempted or achieved <br />before. The main building is a three-story steel and <br />precast structure which houses the classrooms and <br />offices. Each classroom has wireless internet access <br />point, four data drops, overhead projector with media <br />processor, HDMI input, Mic input (for an ipod player), and <br />an amplified sound system. The primary design feature <br />is the adjacent 58-foot tall “skyspace” with a sloped wall, <br />that houses the multipurpose room and resources room. <br />This project will achieve LEED Silver. <br />NAME AND LOCATION OF PROJECT <br />United Neighborhood Organization - <br />Chicago, IL <br />SIZE OF PROJECT <br />56,000 sf <br />CLIENTS CONTACT INFORMATION <br />United Neighborhood Organization <br />Miguel d’Escoto <br />312-656-6423 <br />miguel@portageparkconsultants.com <br />DESCRIPTION OF WORK <br />This project consisted of renovating <br />approximately 2,000 sf of existing <br />school and classroom space into a new <br />health clinic. <br />CONTRACT TERM <br />2/7/2012 - 9/10/2012 <br />FIRM’S RESPONSIBILITY ON THE <br />PROJECT <br />New Construction <br />RESULTS OF PROJECT <br />Complete & Occupied <br />COST OF PROJECT <br />$16,000,000 <br />F. RELATED EXPERIENCE
The URL can be used to link to this page
Your browser does not support the video tag.