Laserfiche WebLink
PROJECT EXPERIENCE <br />PLAQUEMINES PARISH SCHOOL BOARD• South Plaquemines High School, Buras, LA$37 million base contract - The new South Plaquemines High School was elevated 17’ to be above the flood plain and was constructed on wood piling with concrete foundations, columns, and elevated slab. The new 152,932 sf school contains an 11,166 sf auditorium/theater with seating for 647 people, classrooms, science labs, gymnasium, and child facilities. The building is designed and built to meet hurricane wind loads of 145 mph. <br />CITY OF MIAMI• Museum Park Baywalk & Promenade Ph II & III$9.2 million base contract- The Museum Park project consisted of Phases II & III. Phase 2 consisted of soil remediation, demolition, earthwork, underground drainage and water utilities, a new paver baywalk, new concrete sidewalks and pathways, tree transplants, new lighting, new site furnishings, new landscaping and sod, and new irrigation. Phase 3 consisted of a new paver promenade walkway, concrete stairs and ramps, concrete sidewalks and pathways, retaining walls, new lighting, new site furnishings, new landscaping and sod, and new irrigation for the promenade walkway. <br />• Armbrister Park$1.2 million base contract– Design/Build project consisting of a 108,000 SF synthetic turf field to accommodate an American football field, soccer field, and a softball field including all sub-base and base preparation and drainage. Four existing metal bleachers were also repaired, painted, and relocated, after which the existing concrete pads were demolished, and electrical poles, lighting, fencing and trees were relocated or removed as necessary for the construction of the new fields. Additional features included:• Long Jump Pit• 4 lanes 50 meters straight away running track with 10 meters run out room at each end• Drainage system/permeable base for the synthetic turf system installation <br />Previous Project Experience <br />US Army Corps of Engineers, Chicago Harbor Breakwater Repair, Chicago, ILApproximately 5000 LF of structural repairs to the Chicago Harbor Exterior Breakwater system that is located 1.5 miles east of Navy Pier. Deterioration due to low lake levels caused structural damage over time that initiated failure to the concrete cap of the breakwall. Repairs consisted of drilling holes through the existing concrete cap and injecting a specialized grout mixture into the structure to fill voids and enhance structural capacity. <br />RDM Development, Vision on Division, Chicago, ILThe Vision on Division development is 33 condos, about 9,000 square feet of commercial space and roughly 111 parking spots in the underground parking structure. 33,000-square-foot mixed-use development is planned for a vacant lot just east of the MB Financial bank at the corner of Ashland and Division. The structure is a cast in place concrete system with caisson foundations, and the envelope is primarily a impact resistant curtain wall system. <br />I. CONSTRUCTION SERVICES STAFF