My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emerald Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Emerald Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:25:13 AM
Creation date
9/24/2015 10:21:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. CONSTRUCTION SERVICES STAFF <br />PROJECT EXPERIENCE <br />ILLINOIS STATE TOLL HIGHWAY AUTHORITY• Interstate 294 Widening - CIP-664 in Bensenville, IL, $35 million.• Interstate 294 Widening - MIP-90-456 in Indian Head Park, IL, $17.5 million• Northbound Tri-State Tollway Retaining Wall Replacement - Mile Post 41.1 - 41.2 in Rosemont, IL, $1.5 million• South Tri-State Tollway widening and reconstruction, MP 4.06 - MP 5.39 in Hazel Crest, IL, $74,030,451• Tri-State Tollway Open Road Tolling Plaza 41, 163rd St. (MP 5.1 to MP 6.4) in Markham, IL, $22.8 million• Elmhurst Rd Interchange East Bridge at I-90 in Des Plaines, IL, $4.6 million• Elmhurst Rd West Bridge and Interchange at I-90, Des Plaines & Elk Grove Village, IL, $29.8 million <br />METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO• Calumet Primary Settling Tanks - 12 new primary settling tanks, several interconnecting service tunnels, tunnel access pump stations, two new force mains that extend to the grit building and a new East Gate House and associated roadways, $231.2 million <br /> CHICAGO DEPARTMENT OF TRANSPORTATION• Torrence Avenue (130th St. to Calumet River) & 126th Place (Torrence Ave. to Avenue “O”), 15 million• Roosevelt Road Bascule Bridge Rehabilitation, $8.8 million• Roosevelt Road Viaduct, $21.4 million• South Clark Street Ramps - N & S of Roosevelt Rd. Reconstruction, $25.9 million• U.S. Route 41 Relocation - Harbor Street to 79th Street, $15.4 million <br />UNIVERSITY OF ILLINOIS - CHICAGO• ADA Compliance Modifications at Circle Center, $1.1 million• Parking Deck Renovation, $2.3 million• South Campus Improvements including three athletic fields, two intramural fields, infrastructure and 800 vehicle parking lot, $5.1 million <br />CHICAGO DEPARTMENT OF AVIATION• Cicero Avenue Relocation - Midway Airport Terminal Development Program, $10.4 million <br />INDIANA DEPARTMENT OF TRANSPORTATION• Columbus Drive Bridge Replacement in LaPorte, IN, $6.8 million <br />USPS GREAT LAKES FACILITIES SERVICE OFFICE• New Main Post Office in Riverdale, IL, $2.2 million <br />ILLINOIS DEPARTMENT OF TRANSPORTATION• Paving & Pipe at Darmstadt (Item 152) in Hillside, IL, $2.2 million <br />U.S. NAVY• Sanitary Sewer System Improvements at Great Lakes, IL, $10.7 <br />USPS GREAT LAKES FACILITIES SERVICE OFFICE• 270,000 sf Sugar House Renovation, $12.7 million
The URL can be used to link to this page
Your browser does not support the video tag.