My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pirtle Construction's
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Pirtle Construction's
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:35:28 AM
Creation date
9/24/2015 10:31:32 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />This LEED Certified project consists of the complete construction of a new two-story, mixed occupancy building. The facility <br />will include workshops, general office space and several storage areas. The project is being constructed on an extremely <br />tight site and includes all new utilities and site components. <br />CITY OF MIAMI BEACH PROPERTY MANAGEMENT FACILITY <br />MIAMI BEACH, FL <br />APRIL 2004 <br />Date Completed: 10/6/2015 Size: 23,420 SF <br />Firm Responsibility: Construction Management at Risk Cost: $4,934,542 <br />Key Professionals: Mike Geary, Project Executive // Jeff Miles, Project Manager <br />Owner Representative: City of Miami Beach // Humberto Cabanas// 1700 Convention Center Drive, Suite 201, Miami Beach, FL <br />33139 // 305-673-7071 // humbertocabanas@miamibeachfl.gov <br />Architect Representative: Wolfberg Alvarez // Marcel Morlote // 3225 Aviation Ave Suite 400, Miami, FL 33133 // <br />305-666-5474 // rlabrada@wolfbergalvarez.com <br />TIGHT SITE CONSTRAINTS <br />PUBLIC AGENCY PROJECT
The URL can be used to link to this page
Your browser does not support the video tag.