Laserfiche WebLink
23 <br />TAB F - PRE-CONSTRUCTIONSERVICES STAFF <br />Making the right decisions in the early stages of a project is critical to constructing quality buildings and exceeding <br />client expectations. The preconstruction phase is an important stage of a project, and actions taken or decisions <br />made during this period can significantly affect the budget, schedule and quality of a project. Pirtle’s coordinated <br />pre-construction services utilizing state-of-the-art technology, like CMiC and iSqFt to set the tone for a successful <br />project, establishing open communication and fostering a team environment between the construction team, <br />Owner, Architect and subcontractors from day one. <br />Pirtle’s pre-construction planning and creative approach to value engineering consistently limits surprises and <br />lowers overall cost for clients. During preconstruction, we provide guidance regarding selection of materials, <br />building systems, equipment and methods of product delivery. We evaluate and make recommendations on the <br />availability of materials and labor, time requirements for procurement installation and construction, and factors <br />related to cost, including, but not limited to, the cost of alternative designs and/or materials. An organizational <br />chart highlighting the structure of our proposed preconstruction team is shown below, with resumes following. <br />JEFF MILES <br />Project Executive <br />MIKE GEARY <br />President <br />GARY PIRTLEVice President (Sustainability) <br />BILL CONDERDirector of Pre-Construction <br />ELAINE CHOEBIM Coordinator