My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hensel Phelps
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Hensel Phelps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:41:03 AM
Creation date
9/24/2015 10:38:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Preconstruction Services Staff & H. Experience <br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02 <br />September 23, 2015 <br />Page 23 <br />As the Lead Estimator, Mr. Twohig is responsible for the <br />development of CSI Division estimates and all estimating forms <br />and formats for both the conceptual estimate and final bid. He <br />is responsible to the Chief Estimator for the development of <br />pricing strategies and specific purchasing methodology for <br />major projects. It is his responsibility to develop a working <br />relationship with subcontractor principals and estimating <br />departments. He supports in the development of all conceptual <br />estimates for design-build and guaranteed maximum price <br />projects. <br />Years with Hensel Phelps: 2 <br />Years In Industry: 6 <br />Current Office Location: Orlando, FL <br />Education: University of South Florida <br /> B.S., Communication <br />Chris Twohig <br />Lead Estimator <br /> Relevant expeRience: <br />t Preconstruction Experience <br />t Lead Estimator Role <br />t Government Contracting <br />t CM at Risk Delivery <br />t Over $64 Million in <br /> Government Work <br />t On Time/Within Budget <br /> Performance <br />t 100% Committed to this Project <br />naSa headqUaRteRS BUildinG <br />t $64 Million | 200,000 SF <br />t HQ facility for the National Aeronautics and Space Admin. <br />t Eight Story Building, Office Space, Retail Space, Amenities <br />t First floor will house a cafeteria with indoor/outdoor seating, <br /> credit union, barber shop, post office, gift shop, and other <br /> services in large lobby area <br />t Pursuing LEED Platinum Certification <br />Kennedy Space Center, FL <br />BethUne-cookman UniveRSity ReSidence hallS <br />t $59 Million | 300,000 SF <br />t Student Housing Buildings Supporting Over 1,200 Students <br />t Four 4-story Buildings with amenities including a fitness <br /> center, laundry facilities on each floor, computer labs, interior <br /> courtyard, student lounges, and study rooms <br />t Educational Amenities, Lifestyle Design Elements <br />Daytona Beach, FL
The URL can be used to link to this page
Your browser does not support the video tag.