My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications RFQ 12-04-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Specifications RFQ 12-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 11:11:45 AM
Creation date
9/24/2015 11:10:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 12-04-02 19 <br /> <br />3.2 REQUIREMENTS OF THE CONSULTANTS <br /> <br />Consultants interested in performing these services must exhibit considerable relevant experience <br />with this type of work, and should emphasize both experience and capability of particular <br />personnel who will actually perform the work. Consultants should indicate any sub-consultants <br />proposed to be utilized in work for the City. <br /> <br />The selected firm(s) will be responsible for reviewing existing Miami -Dade County, City of Sunny <br />Isles Beach Codes, Resolutions and Ordinances and State of Florida Building Codes and for <br />incorporating data into complete construction documents including final construction plans <br />(working drawings), technical specifications, construction estimates, and related bid documents <br />necessary for the bidding and construction of the projects. <br /> <br />The selected firm(s) will be responsible for obtaining all Federal, State and local permits and / or <br />approvals from Miami-Dade Water and Sewer, DERM, Environmental, HRS, Miami-Dade Public <br />Works, the Florida Department of Transportation (FDOT) as necessary and all City of City of <br />Sunny Isles Beach Building permits necessary for the construction of the projects. Firms may also <br />be required to provide consulting services to the City on various matters which do not result in <br />drawings, specifications or construction documents. <br /> <br />The respondent shall agree to indemnify and hold harmless and pay on behalf of the City, for any <br />liability and/or legal costs arising out of any claims and litigation related to the services provided, <br />to the extent caused by the negligence recklessness, or intentionally wrongful conduct of the <br />respondent in the performance of the contracted services. <br /> <br /> <br />END OF SECTON
The URL can be used to link to this page
Your browser does not support the video tag.